My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering Amend 2
>
Contracts
>
6 Years Then Destroy
>
2019
>
HDR Engineering Amend 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2017 11:40:39 AM
Creation date
8/21/2017 11:40:34 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering
Approval Date
7/12/2017
Council Approval Date
7/5/2012
End Date
3/31/2019
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Final
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Total Compensation
$930,512.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EN <br /> 2. HDR will conduct one (1) impact analysis to critical areas based on the data provided by the <br /> City. <br /> 3. A conceptual wetland mitigation narrative will be provided from the Mitigation Bank Use plan <br /> (Subtask 1000.05). <br /> 4. A single City review and comment response cycle is anticipated for each deliverable. Effort <br /> for multiple City review cycles and iterations is not anticipated or budgeted. <br /> Deliverables <br /> 1. Critical Areas Report (Draft and Final, PDF via email). <br /> Task 1100 50% Design Services <br /> Objective <br /> 1. Advance the design to the 50% design level. The Basis of Design will be the FEN Chlorine <br /> Facility Technical Memorandum dated February 28, 2017 and the FEN Effluent Pump <br /> Station Investigation and Lagoon Hydraulics Technical Memorandum dated March 24, 2017. <br /> The project includes a new building housing the hypochlorite and ammonia chemical <br /> systems and replacement of the pipe system between the polishing pond and chlorine <br /> contact channel with box culverts, as well as a modified outfall manhole/vault structure and <br /> replacement of the diffuser tideflex valves. The building, culverts, and outfall manhole/vault <br /> structures will be supported on piles due to poor ground conditions in the project area. A <br /> backup generator will be installed near the dechlorination facility to provide backup to the <br /> utility power feeding the FEN facilities. <br /> 2. Prepare Engineer's Opinion of Probable Construction Cost (OPCC) at the 50% design level. <br /> 3. Prepare Engineering Report for submittal to the Department of Ecology (DOE). <br /> HDR Services <br /> 1. Utilize computational fluid dynamic (CFD) modeling to confirm the chlorine injection/diffuser <br /> design for the new culvert between the polishing pond and chlorine contact channel. The <br /> results and a summary of the model will be included in the Engineering Report. <br /> A. The CFD analysis will confirm the chlorine diffuser design, orientation, velocities, and <br /> any limited baffling necessary to provide basic mixing for the hypochlorite. <br /> B. The CFD analysis will not extend beyond the bounds of the new culvert. <br /> 2. Prepare an energy code summary of the new chlorine facility and any variance request <br /> required to meet the current code. It is assumed that the facility will be granted a variance <br /> for this this work to avoid interior wall insulation similar to the variance already indicated by <br /> the City regarding fire sprinklers or fire protection hydrants. <br /> 3. Produce 50% level contract documents for the chlorine building, culverts between the <br /> polishing pond and chlorine channel, improvements to the outfall diffusers, and the manhole <br /> improvements on the discharge/outfall piping: <br /> A. A BIM Model will be produced for this design using Revit 2016. Design drawings will <br /> be produced from the Model in Revit on a standard HDR 22" x 34" border using HDR <br /> document production standards. <br /> B. Documents shall include 50% level Drawings as noted in Appendix 1. <br /> City of Everett—WPCF FEN Phase 2 10 Scope of Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.