My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4841 GLENWOOD AVE 2019-01-11
>
Address Records
>
GLENWOOD AVE
>
4841
>
4841 GLENWOOD AVE 2019-01-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:08:29 PM
Creation date
8/21/2017 1:19:17 PM
Metadata
Fields
Template:
Address Document
Street Name
GLENWOOD AVE
Street Number
4841
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
now <br /> LW <br /> RILEYGROUP <br /> April 26, 2017 <br /> Mr.Chad Slayton <br /> Caliber Real Estate Services LLC <br /> 6031 Connection Drive,Suite 100 <br /> Irving,Texas 75039 <br /> RE: Retaining Wall Interim Option Construction Summary <br /> 4841 Glenwood Avenue <br /> Everett, Washington <br /> RGI Project No. 2016-072 <br /> References: The Riley Group, Inc. Retaining Wall Recommendations, 4841 Glenwood Avenue, <br /> Everett, WA, dated August 16, 2016 <br /> The Riley Group, Inc. Retaining Wall Interim Option, 4841 Glenwood Avenue, <br /> Everett,WA,dated March 21,2017 <br /> Dear Mr. Slayton <br /> As requested, The Riley Group, Inc. (RGI) is providing this letter to provide a summary of the <br /> construction of the interim option recommendations provided in our referenced letter dated <br /> March 21, 2017. <br /> Understanding <br /> We understand the City of Everett Code Enforcement is requiring the wall be addressed now <br /> rather than waiting for the dry season to begin work on the replacement of the wall. We also <br /> understand that the replacement wall consisting of a cast in place reinforced wall is not yet <br /> permitted for installation. <br /> Interim Wall Construction <br /> In order to reduce the height of the wall and therefore the loading on the wall,we recommended <br /> removing the top 2 blocks from the top of the wall and installing them as a second wall <br /> approximately 15 feet from the face of the existing wall. The removal of the blocks and wall <br /> construction was completed on April 3, 2017 with a small modification on the south end of the <br /> wall. <br /> The plan near the south end of the wall was modified to shorten the moved wall due to the slope <br /> in the area and the concern of slope erosion if the wall was continued. In order to not disturb the <br /> slope on the south end, the wall was stopped just short of the end of the concrete and a return <br /> wall was installed to retain the area. The top block was removed from the remainder of the wall <br /> and some of the soil was removed from behind the next block down. <br /> This interim solution does not improve the overall stability of the remaining wall to current <br /> design standards due to the lack of batter and the poor soil conditions behind the wall, however <br /> this has reduced the loading on the lower portion of the wall by removing about two and one half <br /> feet of soil from the majority of the wall. <br /> Corporate Office <br /> 17522 Bothell Way Northeast <br /> Bothell,Washington 98011 <br /> Phone 425.415.0551 4 Fax 425.415.0311 <br /> www.riley-group.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.