11/15/2016 Page 1 <br /> City of Everett <br /> 7:54:29AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. B 1508-005 Site Address 215 W MUKILTEO BLVD <br /> Applied 8/3/2015 Applicant BOTESCH NASH&HALL ARCHITECTS Lot <br /> Approved 9/24/2015 Owner OUR SAVIORS LUTHERAN CHU Block <br /> Issued 9/25/2015 Contractor OLYMPIC GENERAL CONTRS LLC Tract <br /> Parent Permit No. Description TI-COVERED COMMONS,REMODEL <br /> Notes <br /> Scheduled Completed Tvue Inspector Result Remarks Inspector's Comments <br /> 1/22/2016 1/22/2016 Framing DWF PartialApproval See notes (Basement restroom finaled 8-21-15 on <br /> B1505-058) <br /> 1st floor rooms 201 to 223&chapel/choir <br /> room. <br /> Complete draft stopping as discussed with <br /> contractor. <br /> Need Plumbing and'electrical rough in <br /> before cover. <br /> 1/25/2016 1/25/2016 Footing DWF Approval As per plans,OK for <br /> concrete <br /> 1/25/2016 1/25/2016 Foundation DWF Approval As per plans,OK for <br /> concrete <br /> 1/25/2016 1/25/2016 StructSlab DWF Approval As per plans,OK for <br /> concrete <br /> 2/16/2016 2/16/2016 DrywallNailing TMB PartialApproval Phase I OK to tape <br /> 2/19/2016 2/19/2016 Foundation KMK Approval OK to pour <br /> 3/2/2016 3/2/2016 StructSlab KMK Approval See notes Phase#2. Rebar in structural slab is#5 18" <br /> DC. <br /> OK to pour. <br /> 4/15/2016 4/15/2016 Framing KMK PartialApproval See notes Overframing to existing building OK to <br /> cover. <br /> Note:A-35s used a rafter tails. <br /> 5/3/2016 5/3/2016 Framing KMK PartialApproval Kitchen demising <br /> wall framing OK <br /> 5/16/2016 5/16/2016 ShearNailing KMK PartialApproval Shear nailing,roof, Roof,west&south side,OK to cover. <br /> see notes <br /> 5/31/2016 5/31/2016 Bldg Other KMK Corr Reqd See notes Please provide all special Inspection reports <br /> listed on S1.0 page to include: <br /> 1)Reinforcing steel&placement; <br /> 2)Concrete&placement; <br /> 3)Roof deck shear; <br /> 4)Please complete Mayes Testing <br /> correction 4/16/16#003. <br /> 7/5/2016 7/5/2016 Framing DWF Special Inspection, Note:Special inspection by Mayes,main <br /> see notes sanctuary <br /> 7/29/2016 7/29/2016 DrywallNailing DWF PartialApproval See notes 1/2 of main sanctuary(south side)offices& <br /> classrooms. <br /> 8/5/2016 8/5/2016 InsulBldg KMK PartialApproval See notes Insulation in walls main sanctuary <br /> complete. Walls only. <br /> 8/11/2016 8/11/2016 DrywallNailing KMK PartialApproval See notes Nailing in main sanctuary OK to mud& <br /> tape. <br /> 10/17/2016 10/17/2016 Grid,Bldg KMK Approval Ceiling grid OK <br /> INSP12 <br /> I>WS YS TE,°vt <br />