Laserfiche WebLink
CITY OF EVERETT PUBLIC WORKS 00 45 13 <br /> SPECIAL PROVISIONS BIDDER QUALIFICATION STATEMENT <br /> 3. The Supplementary Instructions to Bidders (Document 00 22 13) states that the Bidder's <br /> superintendent for the Project must have successfully supervised,or been in a supervisory <br /> capacity such as superintendent or site foreman, to completion at least one Similar <br /> Projects within the ten years prior to bid opening. List the superintendent's name and <br /> projects that show that he or she has this experience. <br /> a. Name: MSI-Keith Claar <br /> PROJECT NAME YEAR OWNER LOCATION DIA/QUANTITY <br /> MSI-Keith Claarl) Chambers WWTP BP#319, 2017 Pierce County, University Place WA <br /> -52"/150LF <br /> 2) -30"/150LF and various other sizes of welded steel pipe laid <br /> DDJ-Lyle Proctor 3) Sumner Central Well Development, 2016 City of Sumner, WA <br /> 4) Transmission Line #5, 2012, City of Everett, WA 51"/600LF <br /> 5) Transmission Line#5 at Pilchuck River, 2015, City of Everett, WA 51"/500LF <br /> 6. Furnish references for information concerning all work listed above. <br /> NAME TITLE PHONE EMAIL <br /> MSI-Keith Claar 1) Chris Stang], Mortenson, Mechanical Project Engineer 425-497-7190 <br /> 2) <br /> DDJ-Lyle Proctor 3) McClure and Sons, Inc., Jon Varriano, General Manager, 425-316-6999 jon@mcclureandsons.com <br /> 4) Imo (Prime) Kelly Brown Project Manager 360-671-3936 kbrown@imcoconstruction.com <br /> 5) Fank Coluccio (Prime) Bill Austell Project Manager 206-722-5306 bill©coluccio.com <br /> Mark Sadler, City of Everett, Project Manager msadler@everettwa.gov <br /> C. Name and title of person filling out form: <br /> Les McClure President <br /> NAME TITLE <br /> END OF DOCUMENT <br /> THREE LAKES VALVE BYPASS July 19,2017 <br /> WO#UP3611 00 45 13 -2 <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />