My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 9/28/2017
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 9/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 10:09:34 AM
Creation date
9/11/2017 10:12:34 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
9/28/2017
Council Approval Date
8/23/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Three Lakes Bypass
Public Works WO Number
UP3611
Tracking Number
0000810
Total Compensation
$1,217,490.34
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 4/28/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons Inc. 8/22/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT PUBLIC WORKS 00 45 13 <br /> SPECIAL PROVISIONS BIDDER QUALIFICATION STATEMENT <br /> DOCUMENT 00 45 13—BIDDER QUALIFICATION STATEMENT <br /> 1.1 GENERAL <br /> A. Fill out the following information: <br /> PROJECT NAME: Three Lakes Valve Bypass(WO#-UP3611) <br /> DATE: 8/8/17 <br /> CONTRACTOR'S COMPANY NAME: McClure and Sons, Inc. <br /> ADDRESS: 15714 Country Club Drive <br /> Mill Creek, WA 98012 <br /> TELEPHONE: 425-316-6999 <br /> EMAIL: bids@mcclureandsons.com or <br /> les@mcclureandsons.com <br /> B. The Bidder must document that the Bidder meets the Supplemental Responsibility Criteria in <br /> the Supplementary Instructions to Bidders (Document 00 22 13). The Bidder should provide <br /> additional sheets to fully describe referenced projects and experience. <br /> 1. The Supplementary Instructions to Bidders (Document 00 22 13) states that the Bidder <br /> must have successfully completed at least two Similar Projects within ten years prior to <br /> bid opening. List the Similar Project's that show that Bidder has this experience. <br /> PROJECT NAME YEAR OWNER LOCATION DIA/QUANTITY <br /> MSI/DDJ 1) Sumner Central Well Development, 2016 City of Sumner, WA <br /> MSI 2) Chambers WWTP BP#319, 2017 Pierce County, University Place WA <br /> 260LF of 30"to 54"welded buried pipe <br /> 3) and various other sizes of welded steel pipe throughout the plant <br /> DDJ 4) Transmission Line#5, 2012, City of Everett, WA 51"/600LF <br /> DDJ 5) Transmission Line#5 at Pilchuck River, 2015, City of Everett, WA 51"/500LF <br /> 2. Furnish references for information concerning all work listed above. <br /> NAME TITLE PHONE EMAIL <br /> MSI/DDJ 1) Dan Mahlum, RH2 Engineering, P.E 425-951-5340 dmahlumrh2.com <br /> MSI 2) Chris Stangl, Mortenson, Mechanical Project Engineer 425-497-7190 <br /> 3) <br /> DDJ 4) Imco (Prime) Kelly Brown Project Manager 360-671-3936 kbrown@imcoconstruction.com <br /> DDJ 5) Frank Coluccio (Prime) Bill Austell Project Manager 206-722-5306 bill@coluccio.com <br /> Mark Sadler, City of Everett, Project Manager msadlera�eve ettwa.gov <br /> THREE LAKES VALVE BYPASS Uly 1 ,2017 <br /> WO#UP3611 00 45 13 - 1 <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />
The URL can be used to link to this page
Your browser does not support the video tag.