My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 9/28/2017
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 9/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 10:09:34 AM
Creation date
9/11/2017 10:12:34 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
9/28/2017
Council Approval Date
8/23/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Three Lakes Bypass
Public Works WO Number
UP3611
Tracking Number
0000810
Total Compensation
$1,217,490.34
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 4/28/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons Inc. 8/22/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> CITY OF EVERETT PUBLIC WORKS 00 01 10 <br /> I <br /> SPECIAL PROVISIONS TABLE OF CONTENTS <br /> Division Section Title Revision Date #of <br /> Pages 1 <br /> SPECIFICATIONS GROUP <br /> General Requirements Subgroup I <br /> DIVISION 01 - GENERAL REQUIREMENTS <br /> 01 10 00 SUMMARY. 07/19/2017 3 111 <br /> 01 20 00 PRICE AND PAYMENT PROCEDURES 07/19/2017 3 <br /> 01 25 00 SUBSTITUTION PROCEDURES 07/19/2017 3 <br /> 01 30 00 ADMINISTRATIVE REQUIREMENTS 07/19/2017 5 <br /> 01 32 16 CONSTRUCTION PROGRESS SCHEDULE 07/19/2017 2 <br /> 01 33 00 SUBMITTAL PROCEDURES 07/19/2017 7 <br /> 01 40 00 QUALITY REQUIREMENTS 07/19/2017 3 <br /> 01 50 00 TEMPORARY FACILITIES AND CONTROLS 07/19/2017 8 <br /> 01 60 00 PRODUCT REQUIREMENTS 07/19/2017 2 <br /> 01 70 00 EXECUTION AND CLOSEOUT REQUIREMENTS 07/19/2017 11 <br /> Facility Construction Subgroup <br /> DIVISION 03 - CONCRETE 111 <br /> 03 21 00 REINFORCEMENT STEEL 07/19/2017 7 <br /> 03 31 00 CAST-IN-PLACE CONCRETE 07/19/2017 30 <br /> 03 32 00 JOINTS IN CONCRETE 07/19/2017 10 <br /> 03 60 00 GROUTING 07/19/2017 12 <br /> DIVISION 05 - METALS I <br /> 05 50 00 MISCELLANEOUS METALWORK 07/19/2017 8 <br /> 05 52 00 ALUMINUM RAILINGS 07/19/2017 4II <br /> DIVISION 06 - WOOD,PLASTICS,AND COMPOSITES <br /> 06 84 00 FIBERGLASS SHELTER 07/19/2017 3 1 <br /> DIVISION 07 -THERMAL AND MOISTURE PROTECTION <br /> 07 92 13 SEALANTS AND CAULKING 07/19/2017 8 <br /> I <br /> DIVISION 09 -FINISHES <br /> 09 90 00 PAINTING AND COATING 07/19/2017 4 <br /> 09 96 00 HIGH-PERFORMANCE COATINGS 07/19/2017 7 <br /> THREE LAKES VALVE BYPASS July 19,2017 i <br /> WO#UP3611 00 01 10-2 <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.