My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 9/28/2017
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 9/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 10:09:34 AM
Creation date
9/11/2017 10:12:34 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
9/28/2017
Council Approval Date
8/23/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Three Lakes Bypass
Public Works WO Number
UP3611
Tracking Number
0000810
Total Compensation
$1,217,490.34
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 4/28/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons Inc. 8/22/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> CITY OF EVERETT PUBLIC WORKS 00 01 10 <br /> ISPECIAL PROVISIONS TABLE OF CONTENTS <br /> Division Section Title Revision Date #of <br /> I Pages <br /> Facility Services Subgroup <br /> 1 DIVISION 22 - PLUMBING <br /> 22 14 29 SUMP PUMPS 07/19/2017 2 <br /> IDIVISION 23 -HEATING,VENTILATING, AND AIR CONDITIONING(HVAC) <br /> 23 00 00 HEATING, VENTILATING,AND AIR CONDITIONING,GENERAL 07/19/2017 4 <br /> I 23 31 13 METAL DUCTWORK SYSTEMS 07/19/2017 10 <br /> 23 34 00 FAN EQUIPMENT 07/19/2017 3 <br /> I DIVISION 26 - ELECTRICAL <br /> 26 01 05 ELECTRICAL GENERAL 07/19/2017 8 <br /> 26 05 10 WIRE AND CABLE 07/19/2017 11 <br /> I 26 05 26 GROUNDING 07/19/2017 6 <br /> 26 05 33 ELECTRICAL RACEWAYS 07/19/2017 10 <br /> 26 24 16 PANELBOARDS 07/19/2017 3 <br /> I 26 27 26 WIRING DEVICES 07/19/2017 3 <br /> 26 28 16 DISCONNECTS AND FUSED SWITCHES 07/19/2017 2 <br /> 26 28 18 OVERCURRENT PROTECTIVE DEVICES 07/19/2017 2 <br /> I 26 32 13.13 POWER GENERATION 07/19/2017 14 <br /> 26 36 23 AUTOMATIC TRANSFER SWITCHES 07/19/2017 5 <br /> 26 43 00 SURGE PROTECTIVE DEVICE 07/19/2017 6 <br /> I26 51 00 LIGHTING 07/19/2017 3 <br /> Site and Infrastructure Subgroup <br /> 1 DIVISION 31 - EARTHWORK <br /> 31 05 13 SOILS FOR EARTHWORK 07/19/2017 2 <br /> 31 05 16 AGGREGATES FOR EARTHWORK 07/19/2017 2 <br /> i31 23 16 EXCAVATION 07/19/2017 2 <br /> 31 23 16.13 TRENCHING 07/19/2017 4 <br /> 31 23 19 DEWATERING 07/19/2017 3 <br /> I31 23 23 FILL 07/19/2017 3 <br /> 31 25 00 EROSION AND SEDIMENTATION CONTROLS 07/19/2017 2 <br /> IDIVISION 32 - EXTERIOR IMPROVEMENTS <br /> 32 92 19 SEEDING 07/19/2017 4 <br /> ITHREE LAKES VALVE BYPASS July 19, 2017 <br /> WO#UP3611 000110-3 <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.