Laserfiche WebLink
1 <br /> ' CITY OF EVERETT PUBLIC WORKS 012500 <br /> SPECIAL PROVISIONS SUBSTITUTION PROCEDURES <br /> 1 <br /> SECTION 01 25 00-SUBSTITUTION PROCEDURES <br /> PART 1 -GENERAL <br /> 1.1 SECTION INCLUDES <br /> ' A. Quality assurance. <br /> B. Product substitution procedures. <br /> ' 1.2 QUALITY ASSURANCE <br /> ' A. Contract is based on products and standards established in Contract Documents without <br /> consideration of proposed substitutions. <br /> B. Products specified define standard of quality, type, function, dimension, appearance, and <br /> performance required. <br /> C. Substitution Proposals: Permitted for specified products except where specified otherwise. Do <br /> ' not substitute products unless substitution has been accepted and approved in writing by Owner. <br /> ' 1.3 PRODUCT SUBSTITUTION PROCEDURES <br /> A. Document 00 21 13 - Instructions to Bidders specifies time restrictions for submitting requests <br /> for substitutions during Bidding period. <br /> B. Substitutions may be considered when a product becomes unavailable through no fault of <br /> Contractor. <br /> ' C. Document each request with complete data, substantiating compliance of proposed substitution <br /> with Contract Documents,including: <br /> 1. Manufacturer's name and address, product, trade name, model, or catalog number, <br /> performance and test data,and reference standards. <br /> 2. Itemized point-by-point comparison of proposed substitution with specified product, <br /> ' listing variations in quality,performance, and other pertinent characteristics. <br /> 3. Reference to Article and Paragraph numbers in Specification Section. <br /> 4. Cost data comparing proposed substitution with specified product and amount of net <br /> change to Contract Sum. <br /> 5. Changes required in other Work. <br /> 6. Availability of maintenance service and source of replacement parts as applicable. <br /> 7. Certified test data to show compliance with performance characteristics specified. <br /> ' 8. Samples when applicable or requested. <br /> 9. Other information as necessary to assist Engineer's evaluation. <br /> THREE LAKES VALVE BYPASS July 19, 2017 <br /> WO#UP3611 01 25 00 - 1 <br />