My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 9/28/2017
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 9/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 10:09:34 AM
Creation date
9/11/2017 10:12:34 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
9/28/2017
Council Approval Date
8/23/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Three Lakes Bypass
Public Works WO Number
UP3611
Tracking Number
0000810
Total Compensation
$1,217,490.34
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 4/28/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons Inc. 8/22/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> ' CITY OF EVERETT PUBLIC WORKS 012500 <br /> SPECIAL PROVISIONS SUBSTITUTION PROCEDURES <br /> 1 <br /> SECTION 01 25 00-SUBSTITUTION PROCEDURES <br /> PART 1 -GENERAL <br /> 1.1 SECTION INCLUDES <br /> ' A. Quality assurance. <br /> B. Product substitution procedures. <br /> ' 1.2 QUALITY ASSURANCE <br /> ' A. Contract is based on products and standards established in Contract Documents without <br /> consideration of proposed substitutions. <br /> B. Products specified define standard of quality, type, function, dimension, appearance, and <br /> performance required. <br /> C. Substitution Proposals: Permitted for specified products except where specified otherwise. Do <br /> ' not substitute products unless substitution has been accepted and approved in writing by Owner. <br /> ' 1.3 PRODUCT SUBSTITUTION PROCEDURES <br /> A. Document 00 21 13 - Instructions to Bidders specifies time restrictions for submitting requests <br /> for substitutions during Bidding period. <br /> B. Substitutions may be considered when a product becomes unavailable through no fault of <br /> Contractor. <br /> ' C. Document each request with complete data, substantiating compliance of proposed substitution <br /> with Contract Documents,including: <br /> 1. Manufacturer's name and address, product, trade name, model, or catalog number, <br /> performance and test data,and reference standards. <br /> 2. Itemized point-by-point comparison of proposed substitution with specified product, <br /> ' listing variations in quality,performance, and other pertinent characteristics. <br /> 3. Reference to Article and Paragraph numbers in Specification Section. <br /> 4. Cost data comparing proposed substitution with specified product and amount of net <br /> change to Contract Sum. <br /> 5. Changes required in other Work. <br /> 6. Availability of maintenance service and source of replacement parts as applicable. <br /> 7. Certified test data to show compliance with performance characteristics specified. <br /> ' 8. Samples when applicable or requested. <br /> 9. Other information as necessary to assist Engineer's evaluation. <br /> THREE LAKES VALVE BYPASS July 19, 2017 <br /> WO#UP3611 01 25 00 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.