Laserfiche WebLink
CITY OF EVERETT PUBLIC WORKS 012500 <br /> SPECIAL PROVISIONS SUBSTITUTION PROCEDURES <br /> D. A request constitutes a representation that Contractor: <br /> 1. Has investigated proposed product and determined that it meets or exceeds quality level <br /> of specified product. <br /> 2. Will provide same warranty for substitution as for specified product. <br /> 3. Will coordinate installation and make changes to other Work that may be required for the <br /> Work to be complete with no additional cost to Owner. <br /> 4. Waives claims for additional costs or time extension that may subsequently become <br /> apparent. <br /> 5. Will coordinate installation of the accepted substitute, making such changes as may be <br /> required for the Work to be complete in all respects. <br /> 6. Will reimburse Owner and Engineer for review or redesign services associated with <br /> reapproval by authorities having jurisdiction. , <br /> E. Substitutions will not be considered when they are indicated or implied on Shop Drawing or <br /> Product Data submittals without separate written request or when acceptance will require <br /> revision to Contract Documents. <br /> F. Substitution Submittal Procedure: <br /> 1. Submit requests for substitutions on City of Everett forms. <br /> 2. Submit electronic files to Project website of Request for Substitution for consideration. <br /> Limit each request to one proposed substitution. <br /> 3. Submit Shop Drawings, Product Data, and certified test results attesting to proposed <br /> product equivalence. Burden of proof is on proposer. <br /> 4. Engineer will notify Contractor in writing of decision to accept or reject request. <br /> 1.4 INSTALLER SUBSTITUTION PROCEDURES <br /> A. Document 00 21 13 - Instructions to Bidders specifies time restrictions for submitting requests ' <br /> for substitutions during Bidding period. <br /> B. Engineer will consider requests for substitutions only within 30 days after date of Owner- <br /> Contractor Agreement. <br /> C. Document each request with: <br /> 1. Installer's qualifications. <br /> 2. Installer's experience in work similar to that specified. <br /> 3. Other information as necessary to assist Engineer's evaluation. , <br /> D. Substitution Submittal Procedure: <br /> 1. Submit electronic files to Project website of Request for Substitution for consideration. 1 <br /> Limit each request to one proposed substitution. <br /> 2. Engineer will notify Contractor in writing of decision to accept or reject request. <br /> THREE LAKES VALVE BYPASS July 19, 2017 <br /> WOE#UP3611 01 25 00-2 <br />