My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 9/28/2017
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 9/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 10:09:34 AM
Creation date
9/11/2017 10:12:34 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
9/28/2017
Council Approval Date
8/23/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Three Lakes Bypass
Public Works WO Number
UP3611
Tracking Number
0000810
Total Compensation
$1,217,490.34
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 4/28/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons Inc. 8/22/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT PUBLIC WORKS 012500 <br /> SPECIAL PROVISIONS SUBSTITUTION PROCEDURES <br /> D. A request constitutes a representation that Contractor: <br /> 1. Has investigated proposed product and determined that it meets or exceeds quality level <br /> of specified product. <br /> 2. Will provide same warranty for substitution as for specified product. <br /> 3. Will coordinate installation and make changes to other Work that may be required for the <br /> Work to be complete with no additional cost to Owner. <br /> 4. Waives claims for additional costs or time extension that may subsequently become <br /> apparent. <br /> 5. Will coordinate installation of the accepted substitute, making such changes as may be <br /> required for the Work to be complete in all respects. <br /> 6. Will reimburse Owner and Engineer for review or redesign services associated with <br /> reapproval by authorities having jurisdiction. , <br /> E. Substitutions will not be considered when they are indicated or implied on Shop Drawing or <br /> Product Data submittals without separate written request or when acceptance will require <br /> revision to Contract Documents. <br /> F. Substitution Submittal Procedure: <br /> 1. Submit requests for substitutions on City of Everett forms. <br /> 2. Submit electronic files to Project website of Request for Substitution for consideration. <br /> Limit each request to one proposed substitution. <br /> 3. Submit Shop Drawings, Product Data, and certified test results attesting to proposed <br /> product equivalence. Burden of proof is on proposer. <br /> 4. Engineer will notify Contractor in writing of decision to accept or reject request. <br /> 1.4 INSTALLER SUBSTITUTION PROCEDURES <br /> A. Document 00 21 13 - Instructions to Bidders specifies time restrictions for submitting requests ' <br /> for substitutions during Bidding period. <br /> B. Engineer will consider requests for substitutions only within 30 days after date of Owner- <br /> Contractor Agreement. <br /> C. Document each request with: <br /> 1. Installer's qualifications. <br /> 2. Installer's experience in work similar to that specified. <br /> 3. Other information as necessary to assist Engineer's evaluation. , <br /> D. Substitution Submittal Procedure: <br /> 1. Submit electronic files to Project website of Request for Substitution for consideration. 1 <br /> Limit each request to one proposed substitution. <br /> 2. Engineer will notify Contractor in writing of decision to accept or reject request. <br /> THREE LAKES VALVE BYPASS July 19, 2017 <br /> WOE#UP3611 01 25 00-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.