My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 9/28/2017
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 9/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 10:09:34 AM
Creation date
9/11/2017 10:12:34 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
9/28/2017
Council Approval Date
8/23/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Three Lakes Bypass
Public Works WO Number
UP3611
Tracking Number
0000810
Total Compensation
$1,217,490.34
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 4/28/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons Inc. 8/22/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' CITY OF EVERETT PUBLIC WORKS O1 30 00 <br /> SPECIAL PROVISIONS ADMINISTRATIVE REQUIREMENTS <br /> SECTION 01 30 00 -ADMINISTRATIVE REQUIREMENTS <br /> PART 1 -GENERAL <br /> ' 1.1 SECTION INCLUDES <br /> A. Coordination and Project conditions. <br /> B. Preconstruction meeting. <br /> C. Site mobilization meeting. <br /> D. Progress meetings. <br /> ' E. Preinstallation meetings. <br /> F. Closeout meeting. <br /> G. Alteration procedures. <br /> 1.2 COORDINATION AND PROJECT CONDITIONS <br /> ' A. Coordinate scheduling, submittals, and Work of various Sections of Project Manual to ensure <br /> efficient and orderly sequence of installation of interdependent construction elements. <br /> B. Verify that utility requirements and characteristics of operating equipment are compatible with <br /> ' structure utilities. Coordinate Work of various Sections having interdependent responsibilities <br /> for installing, connecting to,and placing operating equipment in service. <br /> C. Coordinate space requirements, supports, and installation of mechanical and electrical Work <br /> indicated diagrammatically on Drawings. Follow routing shown for pipes, ducts, and conduit as <br /> closely as practical; place runs parallel with lines of structure. Use spaces efficiently to <br /> maximize accessibility for other installations, for maintenance, and for repairs. <br /> ' 1. Coordination Drawings: Prepare as required to coordinate all portions of Work. Show <br /> relationship and integration of different construction elements that require coordination <br /> ' during fabrication or installation to fit in space provided or to function as intended. <br /> Indicate locations where space is limited for installation and access and where sequencing <br /> and coordination of installations are important. <br /> ' D. Coordination Meetings: In addition to other meetings specified in this Section, hold <br /> coordination meetings with personnel and Subcontractors to ensure coordination of Work. <br /> THREE LAKES VALVE BYPASS July 19, 2017 <br /> WO#UP3611 01 30 00- 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.