My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 9/28/2017
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 9/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 10:09:34 AM
Creation date
9/11/2017 10:12:34 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
9/28/2017
Council Approval Date
8/23/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Three Lakes Bypass
Public Works WO Number
UP3611
Tracking Number
0000810
Total Compensation
$1,217,490.34
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 4/28/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons Inc. 8/22/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT PUBLIC WORKS 01 30 00 <br /> SPECIAL PROVISIONS ADMINISTRATIVE REQUIREMENTS <br /> 1. Start-up of facilities and systems. <br /> 2. Operations and maintenance manuals. <br /> 3. Testing,adjusting, and balancing. <br /> 4. System demonstration and observation. <br /> 5. Operation and maintenance instructions for Owner's personnel. <br /> 6. Contractor's inspection of Work. <br /> 7. Contractor's preparation of an initial "punch list." <br /> 8. Procedure to request Architect/Engineer inspection to determine date of Substantial <br /> Completion. <br /> 9. Completion time for correcting deficiencies. <br /> 10. Inspections by authorities having jurisdiction. <br /> 11, Certificate of Occupancy and transfer of insurance responsibilities. <br /> 12. Partial release of retainage. <br /> 13. Final cleaning. <br /> 14. Preparation for final inspection. <br /> 15. Closeout Submittals: <br /> a. Project record documents. <br /> b. Operating and maintenance documents. <br /> c. Operating and maintenance materials. <br /> d. Affidavits. <br /> 16. Final Application for Payment. <br /> 17. Contractor's demobilization of Site. <br /> 18. Maintenance. <br /> PART 2-PRODUCTS-Not Used <br /> PART 3 -EXECUTION , <br /> 3.1 ALTERATION PROCEDURES , <br /> A. Designated areas of existing facilities will be occupied for normal operations during progress of <br /> construction. Cooperate with Owner in scheduling operations to minimize conflict and to permit <br /> continuous usage. <br /> 1. Perform Work not to interfere with operations of occupied areas. <br /> 2. Keep utility and service outages to a minimum and perform only after written approval of <br /> Owner. <br /> 3. Clean Owner-occupied areas daily. Clean spillage, overspray, and heavy collection of <br /> dust in Owner-occupied areas immediately. <br /> B. Remove debris and abandoned items from area and from concealed spaces. <br /> C. Close openings in exterior surfaces to protect existing Work from weather and extremes of <br /> temperature and humidity. <br /> THREE LAKES VALVE BYPASS July 19, 2017 <br /> WO#UP3611 01 30 00 -4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.