My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 9/28/2017
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 9/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 10:09:34 AM
Creation date
9/11/2017 10:12:34 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
9/28/2017
Council Approval Date
8/23/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Three Lakes Bypass
Public Works WO Number
UP3611
Tracking Number
0000810
Total Compensation
$1,217,490.34
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 4/28/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons Inc. 8/22/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT PUBLIC WORKS 01 30 00 <br /> SPECIAL PROVISIONS ADMINISTRATIVE REQUIREMENTS <br /> B. Architect/Engineer will make arrangements for meetings, prepare agenda with copies for <br /> participants,and preside over meetings. <br /> C. Attendance Required: Job superintendent, major Subcontractors Contractors and suppliers, and <br /> Architect/Engineer,Owner,as appropriate to agenda topics for each meeting. <br /> D. Minimum Agenda: <br /> 1. Review minutes of previous meetings. <br /> 1 <br /> 2. Review of Work progress. <br /> 3. Field observations,problems, and decisions. <br /> 4. Identification of problems impeding planned progress. <br /> 5. Review of submittal schedule and status of submittals. <br /> 6. Review of off-site fabrication and delivery schedules. <br /> 7. Maintenance of Progress Schedule. <br /> 8. Corrective measures to regain projected schedules. <br /> 9. Planned progress during succeeding work period. <br /> 10. Coordination of projected progress. <br /> 11. Maintenance of quality and work standards. <br /> ' 12. Effect of proposed changes on Progress Schedule and coordination. <br /> 13. Other business relating to Work. <br /> 1.6 PREINSTALLATION MEETINGS <br /> A. When required in individual Specification Sections, convene preinstallation meetings at Project <br /> Site before starting Work of specific Section. <br /> B. Require attendance of parties directly affecting, or affected by, Work of specific Section. <br /> 1 C. Notify Architect/Engineer four days in advance of meeting date. <br /> D. Prepare agenda and preside over meeting: <br /> ' 1. Review conditions of installation,preparation,and installation procedures. <br /> 2. Review coordination with related Work. <br /> 1.7 CLOSEOUT MEETING <br /> ' A. Schedule Project closeout meeting with sufficient time to prepare for requesting Substantial <br /> Completion. Preside over meeting and be responsible for minutes. <br /> ' B. Attendance Required: Contractor, major Subcontractors, Architect/Engineer, Owner, and others <br /> appropriate to agenda. <br /> C. Notify Architect/Engineer four days in advance of meeting date. <br /> D. Minimum Agenda: <br /> THREE LAKES VALVE BYPASS July 19, 2017 <br /> WO#UP3611 01 30 00-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.