My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 9/28/2017
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 9/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 10:09:34 AM
Creation date
9/11/2017 10:12:34 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
9/28/2017
Council Approval Date
8/23/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Three Lakes Bypass
Public Works WO Number
UP3611
Tracking Number
0000810
Total Compensation
$1,217,490.34
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 4/28/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons Inc. 8/22/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT PUBLIC WORKS 01 33 00 <br /> SPECIAL PROVISIONS SUBMITTAL PROCEDURES <br /> 1 <br /> SECTION 01 33 00 -SUBMITTAL PROCEDURES <br /> PART 1 -GENERAL <br /> 1.1 SECTION INCLUDES <br /> ' A. Definitions. <br /> B. Submittal procedures. <br /> C. Proposed product list. <br /> D. Product data. <br /> E. Use of electronic CAD files of Project Drawings. <br /> ' F. Shop Drawings. <br /> G. Samples. <br /> H. Design data. <br /> I. Test reports. <br /> J. Certificates. <br /> K. Manufacturer's instructions. <br /> L. Manufacturer's field reports. <br /> ' M. Construction photographs. <br /> N. Contractor review. <br /> ' O. Engineer review. <br /> ' 1.2 DEFINITIONS <br /> A. Action Submittals: Written and graphic information and physical samples that require <br /> Engineer's responsive action. <br /> B. Informational Submittals: Written and graphic information and physical Samples that do not <br /> require Engineer's responsive action. Submittals may be rejected for not complying with <br /> requirements. <br /> THREE LAKES VALVE BYPASS July 19, 2017 <br /> WO#UP3611 01 33 00- 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.