McClure and Sons Inc. 9/28/2017
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 9/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 10:09:34 AM
Creation date
9/11/2017 10:12:34 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
9/28/2017
Council Approval Date
8/23/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Three Lakes Bypass
Public Works WO Number
UP3611
Tracking Number
0000810
Total Compensation
$1,217,490.34
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 4/28/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons Inc. 8/22/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT PUBLIC WORKS 01 50 00 <br /> SPECIAL PROVISIONS TEMPORARY FACILITIES AND CONTROLS <br /> I <br /> D. Use of existing on-Site streets and driveways used for construction traffic is not permitted. <br /> Tracked vehicles are not allowed on paved areas. <br /> E. Maintenance: <br /> 1. Maintain traffic and parking areas in sound condition free of excavated material, <br /> construction equipment, products, mud,snow, ice,and the like. <br /> F. Removal,Repair: <br /> 1. Remove temporary materials and construction at Substantial Completion. <br /> 2. Repair existing permanent facilities damaged by use,to original condition. <br /> 1.10 PROGRESS CLEANING AND WASTE REMOVAL <br /> A. Maintain areas free of waste materials, debris, and rubbish. Maintain Site in clean and orderly ' <br /> condition. <br /> B. Collect and remove waste materials, debris, and rubbish from Site periodically and dispose of <br /> off-Site. <br /> 1.11 PROJECT IDENTIFICATION <br /> A. Project Identification Sign: <br /> 1. One painted sign,32-sq ft area,bottom two feet aboveground. <br /> 2. Content: <br /> a. Project title,logo,and name of Owner. <br /> b. Name of phone number of Prime Contractor. ' <br /> 3. Graphic Design, Colors, and Style of Lettering:Designated by Engineer. <br /> B. Design sign and structure to withstand 60-mph wind velocity. I <br /> C. Show content, layout, lettering,color,foundation, structure,sizes, and grades of members. <br /> D. Installation: <br /> 1. Install Project identification sign within 15 days after date established by Notice to <br /> Proceed. <br /> 2. Erect at location of high public visibility adjacent to main entrance to Site. <br /> 3. Erect supports and framing on secure foundation,rigidly braced and framed to resist wind <br /> loadings. <br /> 4. Install sign surface plumb and level, with butt joints.Anchor securely. <br /> 5. Paint exposed surfaces of sign, supports, and framing. <br /> I <br /> THREE LAKES VALVE BYPASS July 19, 2017 <br /> WO#UP3611 01 50 00-4 <br />