My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 9/28/2017
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 9/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 10:09:34 AM
Creation date
9/11/2017 10:12:34 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
9/28/2017
Council Approval Date
8/23/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Three Lakes Bypass
Public Works WO Number
UP3611
Tracking Number
0000810
Total Compensation
$1,217,490.34
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 4/28/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons Inc. 8/22/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> CITY OF EVERETT PUBLIC WORKS 01 50 00 <br /> SPECIAL PROVISIONS TEMPORARY FACILITIES AND CONTROLS <br /> B. Provide space for Project meetings,with table and chairs to accommodate eight persons. <br /> C. Locate field offices and sheds a minimum distance of 50 feet from existing and new structures. <br /> D. Do not use permanent facilities for field offices or for storage. <br /> E. Construction: Portable or mobile buildings. or buildings constructed with floors raised <br /> aboveground, securely fixed to foundations with steps and landings at entrance doors. <br /> ' 1. Construction: Structurally sound, secure, weathertight enclosures for office and storage <br /> spaces. Maintain during progress of Work;remove enclosures at completion of Work. <br /> 2. Thermal Resistance of Floors, Walls, and Ceilings: Compatible with occupancy and <br /> storage requirements. <br /> F. Environmental Control: <br /> 1 1. Heating, Cooling, and Ventilating for Offices: Automatic equipment to maintain comfort <br /> conditions. <br /> 2. Storage Spaces: Heating and ventilating as needed to maintain products according to <br /> Contract Documents; lighting for maintenance and inspection of products. <br /> G. Removal: At completion of Work remove buildings, foundations, utility services, and debris. <br /> Restore areas to same or better condition as original condition. <br /> 1.8 VEHICULAR ACCESS <br /> ' A. Construct temporary all-weather access roads from public thoroughfares to serve construction <br /> area, of width and load-bearing capacity to accommodate unimpeded traffic for construction <br /> ' purposes. <br /> B. Extend and relocate vehicular access as Work progress requires and provide detours as <br /> necessary for unimpeded traffic flow. <br /> C. Locate as indicated on Drawings. <br /> D. Provide and maintain access to control valves free of obstructions. <br /> E. Use existing on-Site roads for construction traffic. <br /> 1 1.9 PARKING <br /> ' A. Provide temporary gravel surface parking areas to accommodate construction personnel. <br /> B. Locate as indicated on Drawings. <br /> C. If Site space is not adequate,provide additional off-Site parking. <br /> I <br /> THREE LAKES VALVE BYPASS July 19,2017 <br /> WO#UP3611 01 50 00 -3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.