My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 9/28/2017
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 9/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 10:09:34 AM
Creation date
9/11/2017 10:12:34 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
9/28/2017
Council Approval Date
8/23/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Three Lakes Bypass
Public Works WO Number
UP3611
Tracking Number
0000810
Total Compensation
$1,217,490.34
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 4/28/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons Inc. 8/22/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> ' CITY OF EVERETT PUBLIC WORKS 01 50 00 <br /> SPECIAL PROVISIONS TEMPORARY FACILITIES AND CONTROLS <br /> 1.18 DUST CONTROL <br /> ' A. Execute Work by methods that minimize raising dust from construction operations. <br /> B. Provide positive means to prevent airborne dust from dispersing into atmosphere and into <br /> Owner-occupied areas. <br /> 1.19 EROSION AND SEDIMENT CONTROL <br /> A. Plan and execute construction by methods to control surface drainage from cuts and fills from <br /> borrow and waste disposal areas. Prevent erosion and sedimentation. <br /> B. Provide temporary measures including berms, dikes, drains, and other devices to prevent water <br /> flow. <br /> ' C. Comply with sediment and erosion control plan indicated on Drawings. <br /> ' 1.20 NOISE CONTROL <br /> A. Provide methods, means, and facilities to minimize noise produced by construction operations <br /> in accordance with Snohomish County Noise Ordinance. <br /> 1.21 POLLUTION CONTROL <br /> ' A. Provide methods, means, and facilities to prevent contamination of soil, water, and atmosphere <br /> from discharge of noxious,toxic substances and pollutants produced by construction operations. <br /> ' B. Comply with pollution and environmental control requirements of authorities having <br /> jurisdiction. <br /> 1.22 REMOVAL OF UTILITIES,FACILITIES,AND CONTROLS <br /> A. Remove temporary utilities, equipment, facilities, and materials before Final Application for <br /> Payment inspection. <br /> B. Remove underground installations to minimum depth of 2 feet. Grade. Site as indicated on <br /> Drawings. <br /> C. Clean and repair damage caused by installation or use of temporary Work. <br /> ' D. Restore existing and permanent facilities used during construction to original condition. Restore <br /> permanent facilities used during construction to specified condition. <br /> r <br /> I <br /> THREE LAKES VALVE BYPASS July 19, 2017 <br /> WO#UP3611 015000 -7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.