' CITY OF EVERETT PUBLIC WORKS O1 70 00 <br /> SPECIAL PROVISIONS EXECUTION AND CLOSEOUT REQUIREMENTS <br /> C. Submit one copy of completed volumes before Substantial Completion. Draft copy be reviewed <br /> and returned after final inspection,with Engineer comments. Revise content of document sets as <br /> required prior to final submission. <br /> D. Submit two sets of revised final volumes within ten days after final inspection. <br /> E. Submit in PDF composite electronic indexed file of final manual within ten days after final <br /> inspection. <br /> ' F. Building Products,Applied Materials, and Finishes: Include product data, with catalog number, <br /> size, composition, and color and texture designations. Include information for re-ordering <br /> custom-manufactured products. <br /> ' G. Instructions for Care and Maintenance: Include manufacturer's recommendations for cleaning <br /> agents and methods, precautions against detrimental agents and methods, and recommended <br /> ' schedule for cleaning and maintenance. <br /> H. Moisture Protection and Weather Exposed Products: Include product data listing applicable <br /> reference standards, chemical composition, and details of installation. Include recommendations <br /> for inspections,maintenance,and repair. <br /> I. Additional Requirements: As specified in individual product Specification Sections. <br /> ' J. Include listing in table of contents for design data, with tabbed fly sheet and space for insertion <br /> of data. <br /> 1.10 MANUAL FOR EQUIPMENT AND SYSTEMS <br /> A. Submit two copies of preliminary draft or proposed formats and outlines of contents before start <br /> of Work.Engineer will review draft and return one copy with comments. <br /> B. For equipment, or component parts of equipment put into service during construction and <br /> ' operated by Owner, submit documents within ten days after acceptance. <br /> C. Submit one copy of completed volumes before Substantial Completion. Draft copy will be <br /> reviewed and returned after final inspection, with Engineer comments. Revise content of <br /> document sets as required prior to final submission. <br /> D. Submit two sets of revised final volumes within ten days after final inspection. <br /> ' E. Submit in PDF composite electronic indexed file of final manual within ten days after final <br /> inspection. <br /> ' F. Each Item of Equipment and Each System: Include description of unit or system and component <br /> parts. Identify function, normal operating characteristics, and limiting conditions. Include <br /> performance curves, with engineering data and tests, and complete nomenclature and model <br /> number of replaceable parts. <br /> I <br /> THREE LAKES VALVE BYPASS July 19, 2017 <br /> WO#UP3611 017000-7 <br />