My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 9/28/2017
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 9/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 10:09:34 AM
Creation date
9/11/2017 10:12:34 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
9/28/2017
Council Approval Date
8/23/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Three Lakes Bypass
Public Works WO Number
UP3611
Tracking Number
0000810
Total Compensation
$1,217,490.34
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 4/28/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons Inc. 8/22/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT PUBLIC WORKS 01 70 00 <br /> SPECIAL PROVISIONS EXECUTION AND CLOSEOUT REQUIREMENTS <br /> G. Panelboard Circuit Directories: Provide electrical service characteristics, controls, and <br /> communications;by label machine. <br /> H. Include color-coded wiring diagrams as installed. <br /> I. Operating Procedures: Include startup, break-in, and routine normal operating instructions and <br /> sequences. Include regulation, control, stopping,shutdown, and emergency instructions. Include <br /> summer,winter, and special operating instructions. <br /> J. Maintenance Requirements: Include routine procedures and guide for preventative maintenance , <br /> and troubleshooting; disassembly,repair,and reassembly instructions; and alignment, adjusting, <br /> balancing, and checking instructions. <br /> K. Include servicing and lubrication schedule and list of lubricants required. <br /> L. Include manufacturer's printed operation and maintenance instructions. <br /> 111 <br /> M. Include sequence of operation by controls manufacturer. <br /> N. Include original manufacturer's parts list, illustrations, assembly drawings, and diagrams <br /> required for maintenance. <br /> O. Include control diagrams by controls manufacturer as installed. <br /> P. Include charts of valve tag numbers,with location and function of each valve,keyed to flow and <br /> control diagrams. <br /> Q. Include list of original manufacturer's spare parts,current prices, and recommended quantities to <br /> be maintained in storage. <br /> R. Additional Requirements:As specified in individual product Specification Sections. i <br /> S. Include listing in table of contents for design data with tabbed dividers and space for insertion <br /> of data. <br /> 1 <br /> 1.11 PRODUCT WARRANTIES AND PRODUCT BONDS , <br /> A. Obtain warranties and bonds executed in duplicate by responsible Subcontractors,suppliers, and <br /> manufacturers within ten days after completion of applicable item of Work. <br /> B. Execute and assemble transferable warranty documents and bonds from Subcontractors, 1 <br /> suppliers,and manufacturers. <br /> C. Verify documents are in proper form, contain full information,and are notarized. <br /> D. Co-execute submittals when required. <br /> E. Include table of contents and assemble in three D side ring binder with durable plastic cover. <br /> THREE LAKES VALVE BYPASS July 19,2017 <br /> WO#UP3611 01 70 00 - 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.