My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 9/28/2017
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 9/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 10:09:34 AM
Creation date
9/11/2017 10:12:34 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
9/28/2017
Council Approval Date
8/23/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Three Lakes Bypass
Public Works WO Number
UP3611
Tracking Number
0000810
Total Compensation
$1,217,490.34
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 4/28/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons Inc. 8/22/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> ICITY OF EVERETT PUBLIC WORKS 00 72 13 <br /> SPECIAL PROVISIONS GENERAL CONDITIONS <br /> DOCUMENT 00 72 13 -GENERAL CONDITIONS <br /> I TABLE OF CONTENTS <br /> ARTICLE 1 GENERAL INFORMATION 5 <br /> Definitions of Words and Terms 5I1.1 <br /> 1.2 Contract Documents 9 <br /> 1.3 General 10 <br /> I ARTICLE 2 SPECIFICATIONS AND DRAWINGS 10 <br /> 2.1 Interpretation of Specifications and Drawings 10 <br /> 2.2 Division of Specifications and Drawings 11 <br /> I2.3 Discrepancies in Specifications and Drawings 11 <br /> 2.4 Submittals 13 <br /> I 2.5 Contractor's Copies of Contract Documents 13 <br /> ARTICLE 3 OWNER 13 <br /> 3.1 General 13 <br /> 1 3.2 Owner's Representative 14 <br /> ARTICLE 4 CONTRACTOR 15 <br /> I 4.1 CONTRACTOR'S REPRESENTATIVE 15 <br /> 4.2 CONSTRUCTION PROCEDURES 16 <br /> 4.3 SUBCONTRACTORS 16 <br /> I4.4 RESPONSIBILITIES 17 <br /> 4.5 CONTRACTOR'S EMPLOYEES 17 <br /> I4.6 PAYMENT FOR LABOR AND MATERIALS 17 <br /> 4.7 ATTENTION TO WORK 18 <br /> I 4.8 SAFETY 18 <br /> 4.9 THREATS, INTIMIDATION AND HARASSMENT FORBIDDEN 18 <br /> 4.10 WEAPONS FORBIDDEN 18 <br /> I4.11 SAFETY STANDARDS 18 <br /> 4.12 PUBLIC SAFETY AND CONVENIENCE 19 <br /> I4.13 ACCESS TO WORK 19 <br /> 4.14 EMERGENCIES 19 <br /> I4.15 TRENCH EXCAVATION 19 <br /> 4.16 OWNER-CONTRACTOR COORDINATION 19 <br /> I 4.17 MEETINGS WITH OWNER 20 <br /> 4.18 COOPERATION WITH OTHERS 20 <br /> I <br /> THREE LAKES VALVE BYPASS July 19, 2017 <br /> WO#UP361 1 00 72 13 -i <br />
The URL can be used to link to this page
Your browser does not support the video tag.