My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 9/28/2017
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 9/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 10:09:34 AM
Creation date
9/11/2017 10:12:34 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
9/28/2017
Council Approval Date
8/23/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Three Lakes Bypass
Public Works WO Number
UP3611
Tracking Number
0000810
Total Compensation
$1,217,490.34
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 4/28/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons Inc. 8/22/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT PUBLIC WORKS 00 72 13 I <br /> SPECIAL PROVISIONS GENERAL CONDITIONS <br /> ARTICLE 5 PROGRESS AND COMPLETION 21 <br /> I <br /> 5.1 Notice to Proceed 21 <br /> 5.2 Contract Time 21 I 5.3 Suspension Procedures 24 <br /> 5.4 Termination Procedures 24 <br /> 5.5 Possession and Use of Completed Portions of the Work 27 <br /> I <br /> 5.6 Possession of Incomplete Portions of the Project 27 <br /> 5.7 Substantial Completion 27 <br /> 5.8 Acceptance of Work 28 <br /> I <br /> ARTICLE 6 CHANGES 28 <br /> 6.1 Owner's Right to Direct Changes to the Work 28 I 6.2 Extra Work 29 <br /> 6.3 Change Orders 29 <br /> 6.4 Value Engineering and Cost Sharing 29 <br /> I <br /> ARTICLE 7 LABOR STANDARDS 30 <br /> 7.1 Wages of Employees 30 <br /> 7.2 Payment Certificates 31 <br /> 7.3 Hours of Labor 31 <br /> 7.4 Contract Work Hours 31 <br /> I <br /> 7.5 Overtime Work 31 <br /> 7.6 Labor Relations 31 <br /> ARTICLE 8 MATERIAL,EQUIPMENT,WORKMANSHIP AND CONSTRUCTION UTILITIES32 <br /> 1 <br /> 8.1 General 32 <br /> 8.2 Product Data 32 I 8.3 Quality 33 <br /> 8.4 Material and Equipment Specified by Name 33 <br /> 8.5 Requests for Substitution 33 <br /> I <br /> 8.6 Demonstration of Compliance with Contract Requirements 33 <br /> 8.7 Defective Work 35 <br /> 8.8 Materials and Equipment Furnished by Owner 36 <br /> 1 <br /> 8.9 Guarantee 36 <br /> 8.10 Correction Period 37 I ARTICLE 9 MEASUREMENT AND PAYMENT 38 <br /> 9.1 Payments to Contractor 38 <br /> 9.2 Payment for Changes 41 <br /> I <br /> 9.3 Charges to Contractor 42 <br /> 9.4 Compensation to Owner for Time Extension 43 <br /> 9.5 Adjustment of Contract Sum 43 <br /> 1 <br /> 9.6 Unabsorbed and Extended Overhead 44 <br /> THREE LAKES VALVE BYPASS July 19, 2017 <br /> I <br /> WO#UP3611 007213 -ii <br />
The URL can be used to link to this page
Your browser does not support the video tag.