My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4408 RIVERFRONT BLVD 2018-02-21
>
Address Records
>
RIVERFRONT BLVD
>
4408
>
4408 RIVERFRONT BLVD 2018-02-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2018 8:26:37 AM
Creation date
9/11/2017 11:54:41 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
4408
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� 2 � <br /> DESIGNuz FIELD REPORT <br /> 1 of 5 <br /> Project Name: Everett River Front- Simpson Report: 124 <br /> GeoDesign #: Polygon-127-01 Date: 10/10/2016 <br /> Reports with Unresolved Nonconformance Issues: Permit: <br /> P W 1505-005 ©2 <br /> °l-0 U J <br /> Nick Abdelnour(Polygon) Randy Allen(City of Everett) Weather: Clear, 50's <br /> Ron Bowen(Polygon) Eddy Stevens(Polygon) Arrival/Departure: 1700/1830 <br /> Distribution: -- ----- -- -- <br /> Doug Ross(Polygon) Kirk Keck(City of Everett) <br /> Paul McKee(City of Everett) Dave Foster(City of Everett) Prepared By., Ben Weinberg, E.I.T. <br /> m Site Plan(s) m Density Test Summary Signature: may:• �� <br /> Attachments: _ --- - — --- — ---- <br /> ❑ Installation Records ❑ Other � Reviewed By: /VX <br /> PURPOSE of VISIT: GeoDesign representative, Benjamin Weinberg, was on-site part time at the request of John Feltner <br /> with Polygon to observe the foundation subgrade from Lots 164, 165, and 119. Upon arrival, GeoDesign spoke with John <br /> Feltner. <br /> SUMMARY of OBSERVATIONS: <br /> Lot 164: <br /> Upon arrival, GeoDesign noted that the foundation excavation subcontractor had completed excavation of the footing and <br /> crawl space area for Lot 164. GeoDesign noted that the exposed footing subgrade for Lot 164 generally consisted of a gray <br /> and brown silty SAND (f-m) with gravel (f-c) which could be penetrated generally less than 4 inches. GeoDesign noted an <br /> approximately 15 feet long section in the north corner of the foundation area which could be probed 1 to 1.5 feet and <br /> recommended that the material be over-excavated down to firm and unyielding material and be replaced with a structural fill <br /> material. <br /> Relative compaction of the exposed footing subgrade area was tested using a Troxler 3430 Moisture-Density Gauge. <br /> In-place density tests indicated that the exposed foundation subgrade materials had been compacted to greater than 95% <br /> of its maximum dry density as determined by a Modified Proctor analysis. With the exception of the previously mentioned <br /> area, it is GeoDesign's opinion that the exposed footing subgrade observed today is currently suitable for support of the <br /> intended structure. GeoDesign recommends that any loose and saturated material be removed from the base of the footing <br /> areas prior to the placement of concrete. <br /> Lot 165: <br /> Upon arrival, GeoDesign noted that the foundation excavation subcontractor had completed excavation of the footing and <br /> crawl space area for Lot 165. GeoDesign noted that the exposed footing subgrade material for Lot 165 consisted of a gray <br /> silty SAND (f-m) with gravel (f-c) and gray-brown SAND (f-m)with silt which could generally be probed less than 3 inches. <br /> In-place density tests taken on the exposed footing subgrade materials indicated that the materials had been compacted to <br /> greater than 95% of its maximum dry density as determined by a Modified Proctor analysis. <br /> It is GeoDesign's opinion that the exposed footing subgrade observed today is currently suitable for support of the intended <br /> structure. GeoDesign recommends that any loose and saturated material be removed from the base of the footing areas <br /> prior to the placement of concrete. <br /> This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and <br /> specifications throughout the duration of the project irrespective of the presence of our representative.Our work does not include supervision or direction of the contractor,the contractor's employees <br /> or agents. Our firm Is not responsible for site safety.This field report is a DRAFT representatlon of our field observations,testing,and preliminary recommendations. The report can only be considered <br /> final upon review of the GeoDesign project manager,as indicated by Initials in the"Reviewed 8y'section. <br /> 10700 Meridian Avenue North,Suite 402 1 Seattle,WA 98133 1 206.838.9900 <br /> 2502 Jefferson Avenue I Tacoma,WA 98402-1, .253.203.0095 <br /> f r <br /> J/f <br />
The URL can be used to link to this page
Your browser does not support the video tag.