My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017/09/06 Council Agenda Packet
>
Council Agenda Packets
>
2017
>
2017/09/06 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2017 9:53:08 AM
Creation date
9/13/2017 9:52:16 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/6/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> 0 Project: Water Filtration Plant Programmed Logic <br /> Controllers Replacement Project <br /> Change Order No. 2 <br /> • <br /> • Change Order Effective Date: September 22nd <br /> , <br /> 2017 <br /> CITY • <br /> Attest: Approved As to Form: <br /> • <br /> • <br /> Mayor City Clerk City Attorney <br /> Date: Date: Date: <br /> Recommended By: " <br /> Construction Project Engineer (if Engineering Department Director <br /> Manager(if applicable) Manager(if <br /> applicable) applicable) " • <br /> • <br /> • <br /> Date: Date: . Date: Date: <br /> • <br /> CONTRACTOR <br /> By ,= • Date: 57/7/..:2; <br /> Officer <br /> Exhibit A—Description of Changed Work . <br /> Change Order#2 adds one (1) new item to the Contract as follows: <br /> New item#026—Contractor Compensation for Owner Caused Delay Unrelated to Extra Work. <br /> Extended or Unabsorbed Overhead in the lump sate amount of$99.895.00 <br /> The total increase cost to the contract as a result of adding the above one (1)new-item comes to <br /> $99,895.00. <br /> • <br /> • <br /> • <br /> Page 3 of 4 9 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.