My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017/09/06 Council Agenda Packet
>
Council Agenda Packets
>
2017
>
2017/09/06 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2017 9:53:08 AM
Creation date
9/13/2017 9:52:16 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/6/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Water Filtration Plant Programmed Logic <br /> Controllers Replacement Project .. 0 <br /> Change Order No. 2 <br /> Change Order Effective Date: September 22nd, <br /> 2017 <br /> JUSTIFICATION: <br /> Item#026—Contractor Compensation for Owner Caused Delay Unrelated to Extra Work. Per <br /> section 12.4.3 of the WFP PLC Replacement contract the contractor may request an adjusted of the <br /> contract sum for Extended or Unabsorbed Overhead. The contract sum shall be adjusted using the <br /> Eichleay formula detailed in section 9.5.3. <br /> CONTRACT TIME: <br /> By this Change Order#2 the new agreed date for Completion of the work on the Water Filtration Plant <br /> Programmed Logic Controllers Replacement Project will be October 31St,2017. <br /> Page 4 of 4 <br /> 99 <br />
The URL can be used to link to this page
Your browser does not support the video tag.