My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5810 FLEMING ST 2022-02-08
>
Address Records
>
FLEMING ST
>
5810
>
5810 FLEMING ST 2022-02-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 11:31:11 AM
Creation date
9/18/2017 11:05:43 AM
Metadata
Fields
Template:
Address Document
Street Name
FLEMING ST
Street Number
5810
Notes
FLAT RATE TO METER CONVERSIONS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
363
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Activity Work Order <br />Page 1 <br />5/7/2020 13:54 <br />Issued By BRP BIGLEY, RYAN P. <br />Issued Department Pw PUBLIC WORKS <br />Date Issued 2/8/2020 <br />Fund 401 Accounts Program Function Activity <br />Program UT3473 13 11 <br />Title CONVERT .75 INCH 5810 FLEMING ST #1 UT3473-13-11 <br />Work Order No 20200744 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br />Status 2i8i2020 Time 08:59 Oriqinal WO Billinq <br />Customer Information <br />Customer Name <br />Address <br />Apartment No <br />State <br />Subdivision <br />Phone No ( ) - <br />Second Phone ( ) - <br />E-Mail Address <br />Problem Information <br />Address 5810 #1 <br />From Cross Street <br />To Cross Street <br />City <br />Subdivision <br />Problem WATER <br />Sub Problem OTHER <br />Requested By <br />Agency <br />Initiated From <br />Utility Locate (USA) No <br />Assignment Information <br />Dept <br />Crew <br />Contractor <br />Assigned To <br />Assigned By <br />Street <br />City <br />Zip <br />Ext <br />Ext <br />Street FLEMING ST <br />WATER <br />OTHER <br />Map Book <br />Called Date <br />Customer Id <br />Change Map Y/N <br />Zip <br />Map Reference <br />Date Requested <br />Related Request <br />Expiration Date <br />Priority Estimated Hours <br />Assigned Date To Be Comp Date <br />Scheduled Date Scheduled Time <br />Route Route Sequence <br />Comments INVENTORY MATERIAL IN THE AMOUNT OF $492.08 JOURNALIZED IN <br />2020 <br />Action Taken CONVERT .75 INCH CURBSTOP TO.75 INCH SETTER WITH METER AND BOX. FLAT TO METER <br />PROJECT. MEASUREMENTS ARE ON GO -SYNC. <br />Recommended Action <br />Approved By JDF JERRETT, DANIEL F. <br />Start Date i Time <br />Job Cost Information(Y/N) <br />Date Completed 3/6/2020 <br />Permit No <br />
The URL can be used to link to this page
Your browser does not support the video tag.