Laserfiche WebLink
Work Activity Work Order Page 2 <br />5/7/2020 13:54 <br />Issued By BRP BIGLEY, RYAN P. <br />Issued Department Pw PUBLIC WORKS <br />Date Issued 2/8/2020 <br />Fund 401 Account 5 Program Function Activity <br />Program UT3473 13 11 <br />Title CONVERT .75 INCH 5810 FLEMING ST #1 UT3473-13-11 <br />Work Order No 20200744 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br />Status 2/8/2020 Time 08:59 Original WO Billinq <br />Completed By Time Follow Up? <br />Problem Details <br />CONVERT .75 INCH CURBS TOP TO.75 INCH SETTER WITH METER AND <br />BOX. FLAT TO METER PROJECT. <br />Structure ID StrTyp Activity Compl Date Comments <br />WS0685FO86 WASRVC YES 3/6/2020 <br />Address 5810 FLEMING ST <br />Cross Street <br />Area Designator Structure Location <br />Map Reference 5810 FLEMING ST - LOT 1 <br />Location <br />Material Costs <br />Billing <br />Type <br />Mater No <br />Description <br />Quantity Cost <br />Date <br />War <br />M <br />ADAP34000647 <br />ADAPTER 3/4 FIP X 3/4 IPS INSTA-TITE <br />1 <br />17.118 <br />03/10/2020 <br />PAI <br />M <br />ADAP34000547 <br />ADAPTER 3/4 MIP X 3/4 IPS INSTA-TITE <br />4 <br />69.192 <br />03/10/2020 <br />PAI <br />M <br />BOX000154347 <br />BOX METER MOLDED PLASTIC W/DI LID 11" X 18" (SMALL) <br />1 <br />75.608 <br />03/10/2020 <br />PAI <br />M <br />ELL034104247 <br />ELBOW 3/4 NPT 90 DEG STREET BRASS (1/4 BEND) <br />2 <br />8.304 <br />03/10/2020 <br />PAI <br />M <br />METE34141847 <br />METER 5/8 X 3/4 NEPTUNE W/E-CODER R900I CU FT STUB ANTENNA <br />1 <br />210.297 <br />03/10/2020 <br />PAI <br />M <br />PIPE34060647 <br />PIPE 3/4 POLY IPS 200 PSI SIDR7 ASTM D2239 <br />3 <br />.984 <br />03/10/2020 <br />PAI <br />M <br />SETT34149747 <br />SETTER COPPER 5/8 X 3/4 HEIGHT 7" NO LEG LENGTH VINO <br />1 <br />110.581 <br />03/10/2020 <br />PAI <br />Total Material Cost <br />$492.08 <br />NA Costs <br />Type <br />Na No <br />Description <br />Quantity <br />Cost <br />Billing Date WaI <br />NA <br />N/A ` <br />3/4 MINUS ROCK <br />.25 <br />6.405 <br />03/10/2020 <br />NA <br />N/A <br />TOPSOIL <br />.13 <br />3.851 <br />03/10/2020 <br />-Total NA Cost $10.26 <br />