My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kenneth Hunt Alternative Environmental Tech 8/14/2017
>
Contracts
>
6 Years Then Destroy
>
2018
>
Kenneth Hunt Alternative Environmental Tech 8/14/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2017 11:06:56 AM
Creation date
9/22/2017 11:06:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kenneth Hunt Alternative Environmental Tech
Approval Date
8/14/2017
Council Approval Date
8/26/2017
End Date
12/31/2018
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Evergreen Library Expansion Abatement
Tracking Number
0000824
Total Compensation
$19,040.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> SCOPE OF WORK <br /> The purpose of this contract is to provide profedssional hazardous materials abatement design and oversight prior <br /> and durning demolition of the duplex building located at 9425 Holly Drive, Everett, Washington. <br /> The scope of services for this project are to provide during the project design phase to provide drawing and <br /> specifications, and during the construction phase to provide abatement surveillance and monitoring. Surveillance <br /> and monitoring includes delivery of a final closeout report to the City of Everett at the completion of abatement and <br /> upon receipt of all the final submittals from the General Contractor. Asbestos survey,drawings, and specifications <br /> are to be provided and installed as an appendix within the Evergreen Branch Library Expansion Project. <br /> The following services include: <br /> 1. 3161.21 Hazardous Material Design Phase Services: <br /> Verification,Takeoffs,Unit Pricing&Meetings <br /> AET Drawings Title <br /> HZ1.01 Hazmat Cover Sheet 1 -General Notes <br /> HZ1.02 Hazmat Cover Sheet 2-Notes&Site Plan <br /> HZ1.10 DUPLEX-HAZMAT Floor Plans <br /> Drawings-Permit Set <br /> General,Asbestos,Lead <br /> Hazardous Chemicals <br /> Specifications— Permit Set Asbestos <br /> Permit Set Lead <br /> Technical Review by MSPH CIH <br /> AET Specifications Title <br /> 02 8200 Asbestos Abatement <br /> 02 8300 Lead Handling Procedures <br /> Architectural Sets <br /> Review Set <br /> Permit Set <br /> Design Phase <br /> 1. Coordination with City's design team to determine the locations and quantities of asbestos material to be <br /> abated. <br /> 2. Design of abatement scope of work. <br /> 3. Generation of specifications and drawings of acceptable work practices. <br /> Construction Phase <br /> 1. Prebid/Pre-Construction walkthrough and attend Pre-Construction Meeting. <br /> 2. Abatement contractor submittal review. <br /> 3. Mobilize and conduct Pre-abatement sampling. <br /> Page 12 <br /> (Form Approved by City Attorney's Office January 7,2010,updated June 15,2014) <br />
The URL can be used to link to this page
Your browser does not support the video tag.