My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kenneth Hunt Alternative Environmental Tech 8/14/2017
>
Contracts
>
6 Years Then Destroy
>
2018
>
Kenneth Hunt Alternative Environmental Tech 8/14/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2017 11:06:56 AM
Creation date
9/22/2017 11:06:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kenneth Hunt Alternative Environmental Tech
Approval Date
8/14/2017
Council Approval Date
8/26/2017
End Date
12/31/2018
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Evergreen Library Expansion Abatement
Tracking Number
0000824
Total Compensation
$19,040.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Daily on-site observation, compliance monitoring, and PCM air sample collection during abatement <br /> activity. <br /> 5. Closeout. <br /> On-site Services <br /> 1. Secure on-site location will be required to set up an on-site lab during the abatement project. <br /> 2. Each 8-hour on-site shift includes collection and analysis of PCM samples. <br /> 3. Daily reports will include PCM sample data,sampling locations,and an observation log of pertinent <br /> Contractor activity. Copies of pertinent project information will be compiled into a closeout report upon completion <br /> of the project. <br /> Page 13 <br /> (Form Approved by City Attorney's Office November 1,2009) <br />
The URL can be used to link to this page
Your browser does not support the video tag.