Laserfiche WebLink
EXHIBIT B <br /> COMPENSATION <br /> LUMP SUM <br /> The City shall pay Service Provider Eighteen Thousand Two Hundred Forty dollars($18,240.00)upon <br /> completion of the work, subject to the maximum stated in¶4(D)of this Agreement. <br /> A breakdown of the compensation is as follows: <br /> LUMP SUM COMPENSATION <br /> Hazardous Material Design Phase Services: <br /> Asbestos Abatement Specifications and Drawings: $8,360.00 <br /> Lead Sampling&Asbestos Analysis: $2,048.50 <br /> Subtotal Design Phase Services: $10,408.50 <br /> Hazardous Materials Construction Phase Services: <br /> Abatement Surveillance&Monitoring: $5,480.00 <br /> Asbestos Air Sampling Analysis&Close-out Reports: $ 693.50 <br /> Subtotal Construction Phase Services: $6,173.50 <br /> Subtotal Design&Construction Phase Compensation: $16,582.00 <br /> DESIGN CONTINGENCY FEE(IF REQUIRED) <br /> Additional Services that may be needed based upon any issues that surface during the asbestos survey of the <br /> project as approved only in writing and signed by an authorized City representative: <br /> TOTAL CONTINGENCY FEE $1,658.00 <br /> TOTAL FEE $18,240.00 <br />