Laserfiche WebLink
5. R-3 Piping insulation is required on all hot water piping in conditioned and non- <br /> conditioned spaces. <br /> 6. Showers and kitchen faucets installed in the house shall be rated at 1.75 GPM or less. All <br /> other lavatory faucets shall be rated at 1.0 GPM or less (please revise general notes). <br /> Update gen. notes to 2012 IRC. <br /> 7. Provide deck framing plan including deck lateral load connection per R507.2.3 IRC/ <br /> Please prepare a response letter showing where each item in this correction letter is <br /> addressed on the plan set. <br /> Upon resubmittal of the drawings, your application will be given priority and plan review will <br /> recommence. <br /> All required submittals shall be of sufficient detail and contain sufficient information to ensure <br /> that the proposed structure will be constructed in compliance with all adopted codes. <br /> Sincerely, <br /> Je Heilman <br /> Development Technician <br /> 425-257-8976 <br /> Email: iheilman@ci.everett.wa.us <br /> C:\Users\sling\Documents\JHEILMAN PERMIT RESPONSE\Permit Response to Jim Morrison C1404-013.doc <br />