My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
13110 19TH AVE SE 2017-09-25
>
Address Records
>
19TH AVE SE
>
13110
>
13110 19TH AVE SE 2017-09-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2017 2:45:22 PM
Creation date
9/25/2017 2:45:01 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
13110
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2012 Washington State Lay Code Compliance Forms for Commercial,Group4nd>3 story R2 and R3 <br /> 2012 Washington=nergy Code Com fiance Forms for Commercial Buildings including R2&R3 over 3 stories and all R1 Revised Aua 2015 <br /> Project Info Project Address: 2205 BROADWAY Date 5/13/2016 <br /> EVERETT,WA For Building Dept.Use <br /> Applicant Name: Walgreens Co.-Brant Heflin <br /> Applicant Address: 106 Wilmont Rd.MS#1640,Deerfield,IL 60015 <br /> Applicant Phone: (847)315-4595 <br /> Project Description ❑New Building ❑Building Addition Tenant Improvement ❑System Retrofit ❑No System Changes <br /> Briefly describe mechanical systems in <br /> the text box provided <br /> ❑Total Bldg Performance <br /> Total Bldg Performance compliance <br /> includes all mandatory provisions per <br /> C401.2 Option 2.MECH-SUM, <br /> MECH-CHK, and C407 Energy <br /> Analysis Summary forms required. <br /> Mechanical Systems Summary <br /> Air <br /> Compliance Heating Fan Flow Economizer Ventilation <br /> Equip ID Type of System(Note 1) Space(s)Served Path and Cooling Controls (Note 2) (Note 3) Energy Recovery <br /> FC-1ICU- DX split system heat pump Clinic rooms Simple single Heating and Constant SS Expl C403.2.6.1 Not Required <br /> 1 zone system cooling volume(CV) Ventilation <br /> Note 1-Provide basic description of system type,for example: unitary rooftop air handier,built-up central air handler,single-packaged,split system or packaged <br /> terminal air conditioner or heat pump,unit heater,warm-air furnace,electric resistance heater,4-pipe fan coil, VRF system, energy recovery air handler, <br /> make-up air system,ground or water-source heat pump,etc. <br /> Note 2-If taking an exception to air economizer, select exception taken from drop down menu and complete MECH-ECONO form. Summary definitions of each <br /> exception are listed in MECH-ECONO. <br /> Note 3-If ventilation"Not applicable"is selected,provide explanation in Project Description box above. <br /> ❑ Hydronic chilled water ❑ Water-loop heat pump ❑✓ No hydronic systems <br /> HVAC Hydronic Systems <br /> ❑ Hydronic heating ❑ Geothermal <br /> Equipment Type(s) <br /> ❑ Hot water heating tank(s) ❑✓ Instantaneous ❑ No service water systems <br /> Service Water Heating ❑ Heat exchange ace heat boiler oran a from s <br /> ❑ Dedicated boiler g p <br /> Systems central hot wateristeam <br /> Distribution Type(s) <br /> ❑ Circulation System ❑ On-demand <br /> ❑ Mechanical Plans 0 MECH-EQ Form <br /> Mechanical Schedules Indicate location of equipment compliance information.If provided on plans then MECH-EQ forms are not required, <br /> however,include on plans all applicable compliance information listed in MECH-EQ tables. <br /> ❑ Load calculation summary [ MECH-LOAD-CALC Form <br /> Design Load Calculations Provide design load calculations for all mechanical systems and equipment serving the building heating,cooling or <br /> ventilating needs. If a load calculation summary is provided with the permit documents that includes all applicable <br /> compliance information then the MECH-LOAD-CALC form is not required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.