My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
13110 19TH AVE SE 2017-09-25
>
Address Records
>
19TH AVE SE
>
13110
>
13110 19TH AVE SE 2017-09-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2017 2:45:22 PM
Creation date
9/25/2017 2:45:01 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
13110
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2012 Washington Stlergy Code Compliance Forms for Commercial,Group Rio>3 story R2 and R3 <br /> PermitMechanical Plans i of i <br /> 2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2&R3 over 3 stories and all R1 Revised Aug 2015 <br /> Project Address 2205 BROADWAY Date 5/13/2016 <br /> The following information is necessary to check a permit application for compliance with the mechanicial systems and equipment requirements of the <br /> Washington State Energy Code,Commercial Provisions. <br /> Applicable Location in Building Department <br /> (yes,no,na) <br /> Code Section Code Provision Information Required-Must be in permit documents Documents Notes <br /> SERVICE WATER HEATING <br /> Service Water Systems <br /> yes C404.2 Water-heating equip min. Provide equipment schedule with type,capacity,efficiency,test standard or other efficiency P-111&efficiency source SPEC SPEC <br /> 221000 <br /> P-111& <br /> yes C404.3 Temperature controls Indicate temperature controls have required setpoint capability SPEC <br /> 221000 <br /> P-111& <br /> yes C404.4 Heat traps Indicate piping connected to equipment have heat traps on supply&discharge SPEC <br /> 221000 <br /> na C404.5 Insulation under water Indicate R-10 insulation under electric water healer tanks <br /> heater <br /> yes C404.6 Service water piping Indicate R-value of insulation on piping;note exceptions taken P-111& <br /> insulation SPEC <br /> 221000 <br /> Circulation systems and P-111& <br /> yes C404.7/8 heat trace shut-off Indicate shut-off capability based on occupancy and periods of limited demand SPEC <br /> 221000 <br /> na C404.9 Group R-2 service hot water Indicate method of usage metering for dwelling units served by a central service hot water <br /> meters system <br /> Pools&In-Ground Permanently Installed Spas <br /> na C404.10.1 Pool heating equip min. Provide equipment schedule with type,capacity,efficiency,test standard or other efficiency <br /> efficiency source <br /> na C404.10.1/2 Pool heater on/off controls Indicate automatic on/off control based on scheduling&accessible on/off switch on heater that <br /> operates independent of thermostat setting;note exceptions taken <br /> na C404.10.3 Pool covers Indicate vapor retardant cover and insulation rating as required <br /> na C404.10.3 Pool assembly insulation Indicate rating of insulation on sides and bottom of pools heated to>90°F <br /> na C404.10.4 Heat recovery Indicate method,exhaust air temperature reduction and recovered energy use;note <br /> exceptions taken <br /> COMMISSIONING <br /> Specific System Requirements <br /> na C408.2 Mechanical systems Indicate all mechanical systems to be commissioned,for those that will not be commissioned, <br /> commissioning note exception taken <br /> na C408.4 Service water heating Indicate all service water heating systems to be commissioned;for those that will not be <br /> systems commissioning commissioned,note exception taken <br /> na C408.1.1 Commissioning plan Provide commissioning plan for all systems requiring commissioning,include in plan all <br /> required items per this section <br /> na C408.2.2.1&Air system and hydronic Include in commissioning plan that air and hydronic systems shall be balanced in a manner to <br /> C408.2.2.2 system balancing first minimize throttling losses,then adjust to meet design Flow conditions <br /> na C408.2.2.1 Air system balancing Indicate devices that provide the capability to balance all supply air outlets,zone terminals and <br /> devices equipment requiring system balancing <br /> na C408.2.2.2 Hydronic system balancing Indicate devices that provide the capability to isolate,balance and measure flow for all hydronic <br /> devices equipment requiring system balancing <br /> Mechanical systems <br /> na C408.2.3 functional performance Provide description of functional performance testing procedures for all applicable systems <br /> testing including:equipment,controls,economizers <br /> Service water heating <br /> na C408.4.1 functional performance Provide description of functional performance testing procedures for all applicable systems <br /> testing including:equipment,controls,pools and spas <br /> na C408.1.4 Systems operation training Indicate required systems operation training measures to be provided <br /> C408.1.2& Indicate required documentation including:record documents,manuals,balancing reports, <br /> na C403.1.3 Documentation commissioning preliminary and final reports <br /> na C408.1.2.1 Acceptance report Indicate that Commissioning Compliance Checklist(Figure C408.1.2.1)is required upon <br /> completion of preliminary commissioning report <br /> C <br /> 1�1), <br />
The URL can be used to link to this page
Your browser does not support the video tag.