Laserfiche WebLink
2. Southpoint Signal Improvements, Program 981 <br /> Preliminary Engineering (W.O. 2183) <br /> Exxon Oil Rebate $ 9,000 <br /> 1/2 Cent Gas Tax 1,000 <br /> Subtotal $ 10,000 <br /> Construction (W.O. 2184) <br /> Exxon Oil Rebate $ 27,000 <br /> 1/2 Cent Gas Tax 3,000 <br /> Subtotal $ 30,000 <br /> Total Funds, Program 981 $ 40,000 <br /> 3. North Broadway Signal Improvements, Program 445 <br /> Preliminary Engineering (W.O. 2329) <br /> Exxon Oil Rebate $13,500 <br /> 1/2 Cent Gas Tax 1.500 <br /> Subtotal $ 15,000 <br /> Construction (W.O. 2330) <br /> Exxon Oil Rebate $ 40,500 <br /> 1/2 Cent Gas Tax 4,500 <br /> Subtotal $ 45,000 <br /> Total Funds, Program 981 $ 60,000 <br /> Total Funds For Project, Fund 322 $200,000 <br /> This appropriation shall not lapse, but shall be carried forward from year <br /> to year until fully expended or the purpose has been accomplished or <br /> abandoned without the necessity of reappropriation as per R.C.W. 35.33.151. <br /> 3 <br /> (1480) <br />