My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 1777-91
>
Ordinances
>
Ordinance 1777-91
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2017 9:35:20 AM
Creation date
9/28/2017 9:35:18 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
1777-91
Date
4/3/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r r 1 <br /> A. Estimated Project Costs <br /> 1. Evergreen Way North Signal Improvements. Program 980 <br /> Preliminary Engineering (W.O. 2181) $20,000 <br /> Construction (W.O. 2182) 80,000 <br /> Total Estimated Cost, Program 980 $100,000 <br /> 2. Southpoint Signal Improvements. Program 981 <br /> Preliminary Engineering (W.O. 2183) $10,000 <br /> Construction (W.O. 2184) 30.000 <br /> Total Estimated Cost, Program 981 $ 40,000 <br /> 3. North Broadway Signal Improvements. Program 445 <br /> Preliminary Engineering (W.O. 2329) $15,000 <br /> Construction (W.O. 2330) 45.000 <br /> Total Estimated Cost, Program 445 $ 60.000 <br /> Total Estimated Project Cost, Fund 322 $200,000 <br /> B. Source of Funds <br /> 1. Evergreen Way North Signal Improvements. Program 980 <br /> Preliminary Engineering (W.O. 2181) <br /> Exxon Oil Rebate $18,000 <br /> 1/2 Cent Gas Tax 2,000 <br /> Subtotal $ 20,000 <br /> Construction (W.O. 2182) <br /> Exxon Oil Rebate $ 72,000 <br /> 1/2 Cent Gas Tax 8,000 <br /> Subtotal $ 80,000 <br /> Total Funds, Program 980 $100,000 <br /> 2 <br /> (1480) <br />
The URL can be used to link to this page
Your browser does not support the video tag.