My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sazan Group 8/15/2017
>
Contracts
>
6 Years Then Destroy
>
2019
>
Sazan Group 8/15/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2017 10:26:07 AM
Creation date
9/29/2017 10:25:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Sazan Group
Approval Date
8/15/2017
Council Approval Date
8/9/2017
End Date
12/31/2019
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Replacement of WFP Emergency Generators
Public Works WO Number
WO3587
Tracking Number
0000829
Total Compensation
$853,580.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 <br /> July 14, 2017 <br /> City of Everett, Public Works—Water Treatment Plant, Emergency Generator Replacement <br /> Fee Proposal—Professional Architectural and Engineering Services <br /> of North America and Energy Code guidelines. <br /> 3. Signal, Communications, Control and Monitoring: Design for communications, <br /> control and monitoring systems, including; cable, pathways/raceways, cabinets. <br /> Systems interface with existing control and monitoring systems. <br /> 4. Fire Alarm: Performance specification and design coordination of an <br /> addressable Fire Alarm system, including coordination of space requirements. <br /> 5. Construction cost estimating assistance. <br /> H. Commissioning: <br /> 1. Develop Commissioning Plan. <br /> 2. Develop Functional Test Tracking, Scripts and Success Criteria. <br /> 3. Verify installation of mechanical and electrical gear. <br /> 4. Lead and verify functional performance testing of mechanical and electrical <br /> systems. <br /> 5. Collect data and support asset management system population. <br /> 6. Provide and support maintenance protocols for all new equipment including <br /> switchgear, breakers, genset equipment, batteries, alternators,fueling system, etc. <br /> 7. Verify and participate in owner training. <br /> I. Design phases and documentation consisting of: <br /> 1. Project Initiation: <br /> a. Field investigations and record document discovery. <br /> b. Code review. <br /> c. Calculations(including over-current coordination curves)and utility company <br /> coordination. <br /> d. Development design schedule. <br /> 2. 30% Construction Documents: <br /> a. "Basis of Design"narrative, consisting of a written description of basic systems <br /> for the Project. <br /> b. AutoCAD-generated drawings will be produced for all disciplines. <br />
The URL can be used to link to this page
Your browser does not support the video tag.