My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sazan Group 8/15/2017
>
Contracts
>
6 Years Then Destroy
>
2019
>
Sazan Group 8/15/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2017 10:26:07 AM
Creation date
9/29/2017 10:25:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Sazan Group
Approval Date
8/15/2017
Council Approval Date
8/9/2017
End Date
12/31/2019
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Replacement of WFP Emergency Generators
Public Works WO Number
WO3587
Tracking Number
0000829
Total Compensation
$853,580.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 8 <br /> July 14, 2017 <br /> City of Everett, Public Works—Water Treatment Plant, Emergency Generator Replacement <br /> Fee Proposal—Professional Architectural and Engineering Services <br /> E. Services related to sensitive areas are not included. Sensitive areas are as defined in <br /> the Growth Management Act. <br /> F. Services related to Endangered Species Act(ESA)are not included. <br /> G. Landscaping and irrigation designs are not included. <br /> H. Sanitary sewer to the building is not included. <br /> I. Natural gas service to the building is not included. <br /> J. SEPA checklist is not included. <br /> K. Changes will not be made to design after 90%construction documents have been <br /> submitted and review comments made during meetings or through written transmittals, <br /> provided they are not due to our miscalculation, lack of coordination, or construction <br /> budget problems. <br /> L. Evaluation of alternate design proposals by Contractor after Construction Documents <br /> Phase will be considered as Additional Services. <br /> M. Full-time project representation during Construction Phase is not required. Refer to the <br /> extent of representation identified above. <br /> N. Owner-initiated no-cost change orders requiring additional design work during the <br /> Construction Phase will be considered as Additional Services. <br /> O. Energy or Life Cycle Cost Analysis. <br /> P. Design of bid alternatives requiring multiple designs. <br /> Q. Participation in value engineering studies. <br /> R. Participation in third-party constructability reviews. <br /> We appreciate the opportunity to provide architectural and engineering services. If this <br /> proposal is satisfactory, please issue documentation necessary to allow us to proceed <br /> with this work. <br /> Sincerely, <br /> Sazan Group, Inc. <br /> 14".f <br /> Patrick Tilley <br /> Principal <br />
The URL can be used to link to this page
Your browser does not support the video tag.