My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 1667-89
>
Ordinances
>
Ordinance 1667-89
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2017 11:14:34 AM
Creation date
10/3/2017 11:14:32 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
1667-89
Date
12/20/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- • ' A. Estimated Project Costs <br /> 1. Evergreen Way North Signal Improvements, Program 980 <br /> Preliminary Engineering $ 20,000 <br /> W.O. 2181 <br /> Construction <br /> W.O. 2182 80,000 <br /> Total Estimated Cost Program 980 $100,000 <br /> 2. Southpoint Signal Improvements, Program 981 <br /> Preliminary Engineering <br /> W.O. 2183 $ 10,000 <br /> Construction <br /> W.O. 2184 30,000 <br /> Total Estimated Cost, Program 981 40,000 <br /> Total Estimated Project Cost, Fund 322 $140,000 <br /> B. Source of Funds <br /> 1. Evergreen Way North Signal Improvements, Program 980 <br /> a. Preliminary Engineering <br /> W.O. 2181 <br /> Exxon Oil Rebate $ 18,000 <br /> 1/2(t Gas Tax 2,000 <br /> Subtotal $ 20,000 <br /> -2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.