T Bailey Inc 9/28/2017
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2018
>
T Bailey Inc 9/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:12:52 AM
Creation date
10/10/2017 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
T Bailey Inc
Approval Date
9/28/2017
Council Approval Date
9/13/2017
End Date
6/15/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
WPF East Clearwell Roof Replacement
Public Works WO Number
UP3662
Tracking Number
0000873
Total Compensation
$3,022,197.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
T BAILEY INC 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table of Contents <br /> ARTICLE 1. GENERAL 1 <br /> 1.1 Location and Zoning 1 <br /> 1.2 Definitions 1 <br /> ARTICLE 2. EXISTING SITE AND FACILITY INFORMATION 2 <br /> 2.1 Existing Site and Facility Information 2 <br /> ARTICLE 3.SCOPE OF WORK 4 <br /> 3.1 General Scope of Work 4 <br /> ARTICLE 4. OWNER'S PROJECT CRITERIA 4 <br /> 4.1 General 4 <br /> 4.2 Codes,Standards, and Guidelines 5 <br /> 4.3 Performance and General Design Criteria 7 <br /> 4.3.1 East Clearwell 7 <br /> 4.3.2 Screen House Bridge Replacement 9 <br /> 4.4 Structural Design 10 <br /> 4.5 Acceptable Materials 11 <br /> 4.6 Repair Work 12 <br /> 4.6.1 East Clearwell Joint Resealing 12 <br /> 4.6.2 East Clearwell Crack Repair 13 <br /> 4.6.3 Refurbishment of Corroded Items 13 <br /> 4.6.4 East Clearwell Leakage 13 <br /> 4.7 East Clearwell Cleaning and Disinfection 14 <br /> 4.7.1 General 14 <br /> 4.7.2 East Clearwell 14 <br /> ARTICLE 5. CONSTRUCTION 15 <br /> 5.1 General 15 <br /> 5.2 Hours of Construction 15 <br /> 5.3 Site Access 15 <br /> 5.3.1 Project Site 15 <br /> 5.4 Site Preparation and Staging 16 <br /> 5.4.1 General 16 <br /> 5.5 Temporary Facilities and Utilities 17 <br /> 5.6 Non-interference with Ongoing Water Supply Operations 17 <br /> 5.7 Notification Requirements 18 <br /> 5.8 Health and Safety 18 <br /> 5.9 Housekeeping 18 <br /> 5.10 Construction Control and Environmental Protection 18 <br /> 5.10.1 Erosion Control 18 <br /> 5.10.2 Spill Prevention and Control 19 <br /> 5.10.3 Compliance with Environmental Regulations 19 <br /> 5.11 Construction Documentation 19 <br /> 5.11.1 Pre-construction Documentation of Existing Conditions 19 <br /> 5.11.2 East Clearwell Existing Floor and Wall Protection 20 <br /> 5.11.3 Construction Photographs 20 <br /> Hi <br />
The URL can be used to link to this page
Your browser does not support the video tag.