5.11.4 Record Drawings 20 <br /> 5.12 Repair of Damage Caused by Design-Builder 21 <br /> ARTICLE 6. DEMOLITION 21 <br /> 6.1 General Requirements 21 <br /> 6.2 Salvage 21 <br /> 6.3 East Clearwell Roof System Demolition Requirements 22 <br /> 6.4 Screen House Bridge Demolition 22 <br /> 6.5 Disposal of Materials Containing Lead and Hazardous Materials 22 <br /> ARTICLE 7. SITE RESTORATION AND CLEANUP 23 <br /> ARTICLE 8. EAST CLEARWELL ROOF WATER-TIGHTNESS TESTING 23 <br /> 8.1 Roof 23 <br /> 8.1.1 Test Plan 23 <br /> 8.1.2 Conduct of Tests 24 <br /> 8.2 Clearwell Leakage 24 <br /> 8.2.1 Test Plan 24 <br /> ARTICLE 9. SUBMITTALS AND MEETINGS 24 <br /> 9.1 Interim Design Submissions 24 <br /> 9.2 Construction Submissions 24 <br /> 9.3 Meetings and Communications 25 <br /> 9.3.1 Design 25 <br /> 9.3.2 Construction 25 <br /> ARTICLE 10. EXTENDED INTEGRATED ROOF WARRANTY 26 <br /> ARTICLE 11. FORM OF PERFORMANCE AND PAYMENT BONDS 26 <br /> ARTICLE 12. OWNER-FURNISHED MATERIAL AND EQUIPMENT 26 <br /> 12.1 Equipment List 26 <br /> 12.2 Design-Builder Coordination with Vendor - Material and Equipment 26 <br /> 12.3 Schedule 26 <br /> 12.4 Storage Facilities 27 <br /> 12.5 Design-Builder Delivery Acceptance 27 <br /> 12.6 Design-Builder-Provided Equipment and Materials 27 <br /> 12.7 Installation 27 <br /> ATTACHMENT 10.1. EXTENDED WARRANTY TERMS AND CONDITIONS [TO BE INSERTED AFTER <br /> PROPOSAL SUBMITTAL] <br /> ATTACHMENT 11.1. PAYMENT AND PERFORMANCE BOND FORMS <br /> iv <br />