My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
T Bailey Inc 9/28/2017
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2018
>
T Bailey Inc 9/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:12:52 AM
Creation date
10/10/2017 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
T Bailey Inc
Approval Date
9/28/2017
Council Approval Date
9/13/2017
End Date
6/15/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
WPF East Clearwell Roof Replacement
Public Works WO Number
UP3662
Tracking Number
0000873
Total Compensation
$3,022,197.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
T BAILEY INC 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
If during design,the Design-Builder determines that performance requirements are not attainable for <br /> any reason,the Design-Builder shall promptly notify the City of such determination. If the City agrees <br /> with the Design-Builder's determination,the Design-Builder shall propose a Change Order in <br /> accordance with Article 9 of the General Conditions. <br /> Materials, equipment, and components shall be selected and installed based on the requirement for <br /> superior workmanship, which relates to the quality of appearance for items such as, but not limited <br /> to, alignment and plumb of installations and construction, welds, concrete finishes, grouting, <br /> painting, and coatings (including surface preparation), and a high-quality, durable facility consistent <br /> with expectations of a long service life and infrequent need for replacement or repair. The design <br /> shall take into account the aesthetic nature of existing features so that the completed Project fits in <br /> and coordinates with the overall quality and character of the existing Water Filtration Plant. <br /> 4.2 Codes,Standards,and Guidelines <br /> Facilities shall be designed based on the most current applicable codes, and most current applicable <br /> industry standards and guidelines as referenced in this and other sections of the Supplementary <br /> Conditions, unless otherwise indicated. <br /> Where codes and design criteria are subject to interpretation, Design-Builder shall select design <br /> parameters and criteria that result in a more robust and long-lasting facility or structure. Where <br /> codes and standards conflict,the code or standard giving the most conservative design shall govern. <br /> Societies, industry groups, organizations, institutes, and agencies issuing these codes, standards, <br /> and guidelines include, but are not limited to, the following: <br /> 1. The Aluminum Association Engineering and Design Task Force (AA) <br /> 2. American Concrete Institute (ACI) <br /> 3. American Institute of Steel Construction (AISC) <br /> 4. American National Standards Institute (ANSI) <br /> 5. American Petroleum Institute (API) <br /> 6. American Public Works Association (APWA) <br /> 7. American Society of Civil Engineers(ASCE) <br /> 8. American Society of Mechanical Engineers (ASME) <br /> 9. American Society for Testing and Materials (ASTM) <br /> 10. American Welding Society(AWS) <br /> 11. American Water Works Association (AWWA) <br /> 12. City of Everett Building Department <br /> 13. City of Everett Public Works Department <br /> 14. City of Everett "Design and Construction Standards and Specifications" (including most recent <br /> updates) <br /> 15. Crane Manufacturer's Association of America (CMAA) <br /> 16. The Chlorine Institute, Inc. <br /> 17. Concrete Reinforcing Steel Institute (CRSI) <br /> 18. Consumer Product Safety Commission (CPSC) <br /> City of Everett September 13,2017 <br /> Water Filtration Plant Clearwell Roof Replacement DB Project Supplementary Conditions Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.