My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
T Bailey Inc 9/28/2017
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2018
>
T Bailey Inc 9/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:12:52 AM
Creation date
10/10/2017 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
T Bailey Inc
Approval Date
9/28/2017
Council Approval Date
9/13/2017
End Date
6/15/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
WPF East Clearwell Roof Replacement
Public Works WO Number
UP3662
Tracking Number
0000873
Total Compensation
$3,022,197.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
T BAILEY INC 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
accurate colors and free of distortion.Audio commentary shall be provided describing the areas and <br /> items viewed and direction with additional commentary as requested by the City. <br /> All pre-construction documentation shall be acceptable to the City prior to commencing work. <br /> This record shall serve as a basis for determining any subsequent damage due to the Design- <br /> Builder's operations, including but not limited to settlement or movement of structures in the event <br /> of errors or omissions in Design-Builder's structural design. <br /> 5.11.2 East Clearwell Existing Floor and Wall Protection <br /> The Design-Builder shall protect the existing floor and walls from potential damage from construction <br /> activities and falling demolition debris. <br /> If loads are to be placed within the clearwell,the Design-Builder shall first determine the maximum <br /> equipment loading the existing floor can accommodate without cracking or other structural damage. <br /> 5.11.3 Construction Photographs <br /> Design-Builder shall photograph the progress of construction (including demolition)starting one <br /> month after the date of the pre-construction photographs and continuing monthly as long as the <br /> work is in progress. A sufficient number of photographs shall be taken to thoroughly document <br /> construction progress and support Design-Builder's applications for payment. All photographs shall <br /> be taken by a photographer with relevant experience in documenting industrial and municipal <br /> facilities. All photographs shall be taken on minimum 8 megapixel minimum digital format. <br /> 5.11.4 Record Drawings <br /> Design-Builder shall provide the Owner with Record Drawings as follows: <br /> 1. Record drawings shall depict East Clearwell Roof System, Screen House Bridge, additional work <br /> if needed, and all Ancillary Facilities as well as termination points for all demolished facilities at <br /> the Sites. <br /> 2. Record Drawings shall comprise all discipline design drawings required to accomplish the work. <br /> 3. Record Drawings shall be in AutoCAD, PDF, and half-size (11" x 17") hard copy format.All <br /> electronic formats shall be provided in the latest release of the software available at the time of <br /> the submittal. <br /> Design-Builder shall record as-constructed information concurrently with construction progress. <br /> Owner's Representative will review record drawings as part of the monthly pay request review <br /> process. No Work shall be concealed or buried until the required Record Drawing information is <br /> recorded. <br /> City of Everett September 13,2017 <br /> Water Filtration Plant Clearwell Roof Replacement DB Project Supplementary Conditions Page 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.