Laserfiche WebLink
12.4 Storage Facilities <br /> Owner-furnished equipment may be stored on site at a location to be identified by the Owner's <br /> Representative. The Design-Builder shall provide equipment, labor, and materials necessary to <br /> unload the equipment from the delivery truck and move it into the designated location.Alternately, <br /> the Design-Builder may off-load the equipment and move it into the staging area for pedestrian <br /> bridge construction. <br /> 12.5 Design-Builder Delivery Acceptance <br /> The Design-Builder and Owner shall jointly inspect the condition of each piece of equipment upon <br /> delivery. Equipment delivered in crates or otherwise packaged will be uncrated by the Design-Builder <br /> to permit inspection. The condition of the equipment will be recorded by the Design-Builder and <br /> Owner on a form provided by the Owner.At the conclusion of this task, the equipment shall become <br /> a part of this Contract as if it had been furnished by the Design-Builder. Design-Builder shall be <br /> responsible for the care and protection of the Owner-furnished equipment until final acceptance. <br /> 12.6 Design-Builder-Provided Equipment and Materials <br /> The Design-Builder shall provide all equipment and materials necessary to install the Vendor- <br /> provided pedestrian bridge. This includes, but is not limited to,footings and building connection <br /> hardware, anchor bolts, and other materials identified in the conceptual design documents for the <br /> new pedestrian bridge. <br /> 12.7 Installation <br /> The Design-Builder shall provide all labor, equipment, and materials required to install the <br /> pedestrian bridge. The Design-Builder shall provide all new facilities and/or all modifications to the <br /> existing facilities specified to provide for installation of the bridge. The bridge shall be aligned, <br /> connected, and installed at the location shown on the Contract drawings (to be provided by City, <br /> assumed to be generally consistent with conceptual design drawings transmitted with RFP), and in <br /> accordance with the Vendor's recommendations. <br /> City of Everett September 13,2017 <br /> Water Filtration Plant Clearwell Roof Replacement DB Project Supplementary Conditions Page 27 <br />