T Bailey Inc 9/28/2017
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2018
>
T Bailey Inc 9/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:12:52 AM
Creation date
10/10/2017 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
T Bailey Inc
Approval Date
9/28/2017
Council Approval Date
9/13/2017
End Date
6/15/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
WPF East Clearwell Roof Replacement
Public Works WO Number
UP3662
Tracking Number
0000873
Total Compensation
$3,022,197.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
T BAILEY INC 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.1.1.1 Draft Application. In accordance with the current City of Everett <br /> Construction Management Payment Schedule, Design-Builder shall submit to Owner a <br /> report on the current progress of the Work as compared to Design-Builder's Construction <br /> Schedule, and a draft, itemized application for payment for work performed during the <br /> current calendar month on a form supplied or approved by Owner. This shall not <br /> constitute a payment request. Design-Builder and Owner shall confer regarding the <br /> current progress of the Work and the amount of payment to which Design-Builder is <br /> entitled. Owner may on occasion request Design-Builder to provide data substantiating <br /> Design-Builder's right to payment, such as copies of requisitions from Subcontractors of <br /> any tier, and reflecting retainage as provided elsewhere in the Contract Documents. <br /> 7.1.1.2 Payment Request. After Design-Builder and Owner have met and conferred <br /> regarding the updated draft application, and Design-Builder has furnished all progress <br /> information required and all data requested by Owner under 7.1.1.1 above, Design- <br /> Builder shall submit, in accordance with the current City of Everett Construction <br /> Management Payment Schedule, Design-Builder's Application for Payment for Work <br /> completed during the previous month in accordance with Article 6 of the General <br /> Conditions of Contract on a form supplied or approved by Owner. Among other things, <br /> the Application shall state that prevailing wages have been paid in accordance with the <br /> pre-filed statements of intent to pay prevailing wages on file with Owner and that all <br /> payments due Subcontractors of any tier from Owner's payment the prior month have <br /> been made. <br /> 7.1.1.3 Disputed Amounts. If Design-Builder believes it is entitled to payment for <br /> Work performed during the prior calendar month in addition to the agreed-upon amount, <br /> Design-Builder may, also by the tenth day of the month, submit to Owner along with the <br /> approved payment request a separate written payment request specifying the exact <br /> additional amount due, the category in the Schedule of Values in which the payment is <br /> due, the specific Work for which the additional amount is due, and why the additional <br /> payment is due. Furthermore, Design-Builder and all Subcontractors shall file with Owner <br /> by the tenth day of the month certified copies of all payroll records relating to the <br /> additional amount due. <br /> 7.1.1.4 Validity of Payment Requests. A payment request shall not be valid unless <br /> it complies with the requirements of the Contract Documents. <br /> 7.1.2 Owner shall make payment within 30 days after Owner's receipt of each properly <br /> submitted and accurate Application for Payment in accordance with Article 6 of the General <br /> Conditions of Contract, but in each case less the total of payments previously made, less <br /> retainage, and less amounts properly withheld under Section 6.3 of the General Conditions of <br /> Contract. <br /> 7.2 Retainage on Progress Payments <br /> 7.2.1 Pursuant to Chapter RCW 60.28, the Owner will retain five percent of each approved <br /> Application for Payment to be retained as a trust fund for the protection and payment of the <br /> claims of any person arising under the contract and the state with respect to taxes imposed <br /> pursuant to Titles 50, 51, and 82 RCW which may be due from Design-Builder. The moneys <br /> reserved may, at the option of Design-Builder, be retained in accordance with the provisions of <br /> Chapter 60.28 RCW. <br /> 7.2.2 Sixty days after Final Acceptance of the entire Work, which is an action by the Everett <br /> City Council, Owner shall release to Design-Builder all retained amounts in accordance with <br /> chapter RCW 39.12 and chapter RCW 60.28, provided that Design-Builder has submitted: (1) <br /> pursuant to RCW 39.12.040, an "Affidavit of Wages Paid" from Design-Builder and from each <br /> Subcontractor of any tier certified by the Industrial Statistician of the Department of Labor and <br /> Industries, with the fees paid by Design-Builder or Subcontractor of any tier, (2) pursuant to RCW <br /> City of Everett—Contract Page 8 <br /> Between Owner and Design Builder—Lump Sum <br /> East Clearwell Roof Replacement Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.