My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Stellar J Corporation 9/2/2017
>
Contracts
>
Capital Contract
>
Stellar J Corporation 9/2/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2018 9:40:29 AM
Creation date
10/19/2017 10:04:12 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Stellar J Corporation
Approval Date
9/2/2017
Council Approval Date
8/9/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Portal 1 Replacement
Public Works WO Number
UP3602
Tracking Number
0000888
Total Compensation
$765,372.51
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Stellar J Corporation 7/9/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
412
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT PUBLIC WORKS <br /> SPECIAL PROVISIONS <br /> B. Purpose: <br /> 1. Bidding Documents are made available only for the purpose of obtaining offers for the <br /> Project. <br /> 2. Their use does not grant a license for other purposes. <br /> 1.8 EXAMINATION OF DOCUMENTS <br /> A. Completeness: <br /> 1. Upon receipt of Bidding Documents,verify that documents are complete. <br /> 2. Notify Owner if documents are incomplete. <br /> B. Immediately notify Owner upon finding discrepancies or omissions in Bidding Documents. <br /> 1.9 SITE EXAMINATION <br /> A. Examine Project Site before submitting a Bid. <br /> 1. Inspect site of the Work by personal examination, physical testing, or by such other <br /> means as Bidder prefers, of the location of the proposed Work, the actual physical <br /> conditions of and at the Site, surface and subsurface conditions, and conditions ordinarily <br /> to be encountered and generally recognized as inherent in the Work. <br /> 2. If, during the course or as a result of such inspection, examination and testing, a Bidder <br /> finds facts or conditions that appear to conflict or are omitted from the Contract <br /> Documents, or with other data or material made available relating to the Work, Bidder <br /> shall so notify the City in writing, and may apply to the City for additional information <br /> and explanation before submitting their Bid. <br /> 111 B. A visit to Project Site has been arranged for Bidders immediately after the Prebid Meeting. <br /> 1.10 PREBID MEETING <br /> A. A mandatory Prebid Meeting to visit and review the project site, in accordance with <br /> Section 00 25 13 — Prebid Meetings, is scheduled for 9:00 AM local time, on June 28, 2017. <br /> Meet at the WFP Headquarters Building as described in Section 00 25 13 -Prebid Meetings. <br /> B. General Contract and Subcontract Bidders are invited to attend. <br /> C. Representatives of Engineer and Owner will attend. <br /> I <br /> Portal 1 Replacement June 2017 <br /> WO#UP3602 00 21 13 - 3 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.