My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015/12/16 Council Agenda Packet
>
Council Agenda Packets
>
2015
>
2015/12/16 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/24/2015 1:11:38 PM
Creation date
12/24/2015 1:10:48 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/16/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�7 <br /> CERTIFICATE OF COMPLETION <br /> • <br /> Project: Stonnwater Facility Access Retrofit <br /> Contractor: Taylor's Excavators <br /> Work Order No. UT 3464 <br /> • <br /> The above mentioned project was constructed per the plans and specifications and to the <br /> satisfaction of the Public Works Department. <br /> The Contractor physically completed the project,within the time allowed in the contract. <br /> It is recommended that the City accept this project as complete. <br /> Recommended by: <br /> /f (A ( '71 ( /4( <br /> Publio/WOrks Director `Date k. <br /> Dave Davis <br /> Approved by: <br /> • <br /> Mayor, City of Everett Date <br /> Ray Stephanson <br /> Attest: <br /> City Clerk <br /> Sharon Fuller <br /> APPROVED AS TO FORM <br /> iDy. <br /> C,[y Attorney <br /> 43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.