Laserfiche WebLink
Run Date: 4/27/2015 City of Everett-Public Works Department Cutoff Date: 1101.: 1 <br /> Time: 2:30 PM Contract Estimate Voucher <br /> For Work Order#3464B <br /> Project:3.19 Contractor: TAYLOR'S.EXCAVATORS <br /> STORMWATER FACILITY ACCESS Estimate#5 6101 284111 STREET NW <br /> RETROFIT,PHASE II <br /> WO 3454B BID:$346,520.00 STANWOOD,WA 98292 <br /> TOTAL BID$346,520.00 <br /> Total Amt Previous.Amt Present Afnt <br /> Contract Totals to Date $338,171.97 $306,950.76 $31,221.0 <br /> L— <br /> l2efainedArrrounis $16,908.60 $15,347.54 $.1,561.06 <br /> Slate Tax.Amounts $31,111,82 $28;239.47 $2,872.3 <br /> Amounts Paid $352,375.19 $319,842.69 <br /> Amount to be.Paid This Estimate $32,532.50 <br /> FINAL <br /> Checked By l Date A (I4' <br /> Recommended ay ; .. _ Date K 1/ - <br /> Public Works Director 1'� Date <br /> RECORD DRAWING CHECKOFF <br /> Inv actor:,,._,'L .�5 -14_ »,„, U6444/5 <br /> Conirartor: ---- bake: <br /> ' Work Order Number:3464B <br /> • <br /> . i <br />