Laserfiche WebLink
- 13 <br /> Exhibit A <br /> Continued <br /> The anticipated sheet list is as follows: <br /> No. of <br /> Sheet Title Scale Sheets <br /> Cover Sheet N/A . 1 <br /> Legend and Abbreviations N/A 1 <br /> Project Survey Control Plan 1" = 50',DW 1 <br /> Existing Conditions,'1'.hSC,and 1" = 20',DW 7 <br /> Demolition Plan <br /> Dike Repair Plan and Profile 1" = 20' 14 <br /> Dike Repair Sections 1" = 20'H, 6 <br /> 1"=5'V <br /> Dike Repair Details Varies 3 <br /> Access and Haul Route Plan Varies 1 <br /> Total 34 <br /> Abbreviations used are:DW=Double window <br /> • <br /> 5.7 Geotechnical Review of Plans, Specifications, and Estimates (CCI) <br /> CCI will provide input on construction drawings, specifications and cost estimate for geotechnical <br /> aspects of the project Drawings will be created by Otak with review and redline edits by CCI. We <br /> anticipate the following sheets would be required to convey the geotechnical aspects of construction <br /> for bidding purposes. <br /> • General Notes Sheet <br /> • Plan view of dike, scour protection,new dike fill and work limits; <br /> • Typical sections of dike repairs (up to 6 sheets); <br /> • Details sheet <br /> CCI will develop specifications for the sequencing and earthworks construction,material <br /> requirements and guidance for special inspections. Earthwork specifications would include <br /> information for excavation,subgrade preparation,and backfill placement Specifications would be <br /> provided in Word format so that Otak can include them with Otak-prepared general provisions. <br /> CCI will provide input on construction material gnantities and costs. This task includes input to <br /> develop an engineer's estimate for budgeting and bidding purposes. <br /> Task 6 —Services During Bidding <br /> The Otak project team will provide assistance during bidding that may include attending the pre-bid <br /> meeting,answering of questions,providing input and review of addenda,and other general <br /> DDS Dike Repairs and Improvements Project 9 <br /> 16 6 otak <br />