My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017/10/25 Council Agenda Packet
>
Council Agenda Packets
>
2017
>
2017/10/25 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2017 9:56:18 AM
Creation date
11/6/2017 9:55:32 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/25/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> 01 <br /> Appendix A <br /> Cornforth Consultants,Inc. • <br /> Job No.: 2513 <br /> ESTIMATE OF TASK LABOR Date: 9/5/2517 Prepared by: mrm/wno <br /> Job Name:Union Slough Levee Final Design <br /> Mike Pauletto Estimated <br /> Senior Ass;elate Associate . Project Senior Secretary Total Labor CCI Labor Direct Task Total <br /> EngEn ineer Construction Engineer Engineer Drafter Hours Cost Expenses <br /> Consultants <br /> TaskDescription <br /> Task 1 Geotechnical Data Report 10 8 6 2 27 $ 3,660.43 $ 180.00 $ 3,840.43 <br /> 1.1 Prepare and submit a geotechnical date report for inclusion In bid documents 1 <br /> Task 2 Final Design P4 16 $ 6,240.56 $ $ 6,240.56 <br /> 2.1 Analyses and design of proposed repairs near SR-529 24 8 $ 5,137.60 $ - $ 5,137.60 <br /> 22 Provide Input on remain design details <br /> Task 3 Plans,Specifications and Estimates(PS&E) 6,219.88 <br /> 6,019.88 $ 200.00 $ <br /> 28 6 36 $ <br /> 3.1 Provide geotechnical Input on construction drawing package 2 4 52 $ 8,397.36 $ $ 8,397.36 <br /> 3.2 Specifications for earthworks and sequencing 2 4 28 14 40 $ 6,628.60 $ - $ 8,397.36 <br /> 3.3 Provide Input for estimating project coats 4 22 14I <br /> Task 4 Pre-bid Package and Meetings7.32 <br /> 4.1 Attend a pre-bid meeting In Everett,Washington 12 12 $2 8 10 $ ,037.32 $2,017.32 $ 460.00 $,830.46 2 2,,47477.32 <br /> 4.2 Review and respond to pre-bid questions and submittals <br /> CO <br /> Task 5 Project Management and Coordination 6 8 $ 1,494.24 $ $ 1,494.24CO <br /> 5.1 Teleconferences with Otak/DD5 6 8 $ 1,008.6644 $ - $ 1,494.24 <br /> 5.2 Invoicing and contract coordination <br /> Direct Labor(hrs): 9 8 168 66 6 6 191 <br /> Rate per hour($): $ 242.79 $ 250.00 $ 168.11 $ 137.87 $ 82.72 $ 68.63 <br /> Labor Cost by Discipline: $ 2,185.11 $ 2,000.00 $ 28,242.48 $9,099.42 $ 496.32 $ 411.78 $ 42,435.11. $ 42,435.11 $ 840.00 $ 43,275.11 <br /> Assumptions: <br /> Otak will perform the drafting of all the construction drawings <br /> Comforth to provide redlines and comments for drawings <br /> Attend a pre-bid meeting In Everett with an overnight stay <br />
The URL can be used to link to this page
Your browser does not support the video tag.