My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017/10/25 Council Agenda Packet
>
Council Agenda Packets
>
2017
>
2017/10/25 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2017 9:56:18 AM
Creation date
11/6/2017 9:55:32 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/25/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 CRC Scope of Work 1 of 4 <br /> Appendix B <br /> Cultural Resource Consultant <br /> Project Scope and Fee Agreement <br /> Client Information <br /> Company Phone Cell Direct Line <br /> Otak 425-822-4446 <br /> Project Manager/Contact Name Email <br /> Dave Stewart dave.stewart@otak.com <br /> Mailing Address City,State,Zip <br /> 2731 Wetmore Avenue, Suite 402 Everett,WA 98201 <br /> Project Information <br /> Project Title Regulatory Nexus CRC Project Number <br /> Diking District 5 Dike Repairs 1708E <br /> Project Location City <br /> along Union Slough from Interstate-5 to the State Route (SR) 529 southbound bridge Everett <br /> Section Township Range County Total Project Area <br /> 4 29 North 05 East Snohomish ca.6 acres <br /> Project Description <br /> The Diking District 5 Dike Repairs project is located within the City of Everett(the City),within the Snohomish <br /> River Estuary on the northern side of Smith Island. Smith Island is located between the Snohomish River to the <br /> west and Union Slough to the east.There is a system of dikes around Smith Island that protect the island from <br /> much of the flooding that can occur due to high tides from Puget Sound and river flows from the Snohomish <br /> River.Much of the dike system on Smith Island is currently within Diking District 5 (DD5),and the DD5 <br /> currently maintains all dikes around Smith Island.Portions of the dike along Union Slough are in need of repair in <br /> accordance with the Army Corps of Engineers'2017 inspection due to erosion and scour along the slope of the <br /> dike facing the slough. <br /> Project Schedule <br /> Anticipated Completion Date: <br /> September- CRC anticipates completion of field investigation within 30 days of this signed contract.A final <br /> October 2017 report will be submitted within 30 days of fieldwork completion. <br /> Ballard Labs <br /> 1416 NW 46th'pV De 105 PMB346 <br /> _ ..,,, .,,,.,N, 90R RFA-A(19(1—wunu rrrwa.rom <br />
The URL can be used to link to this page
Your browser does not support the video tag.