Laserfiche WebLink
December 30, 2015 <br /> AGREEMENT AMENDED — MASTER PLANNING FOR SOUTH <br /> EVERETT FOREST PRESERVE <br /> Moved by Council Member Stonecipher, seconded by Council <br /> Member Tuohy, to authorize the Mayor to sign Amendment No. 1 to <br /> the Professional Services Agreement with Perteet, Inc. for master <br /> planning and the preparation of construction documents for the <br /> South Everett Forest Preserve at no additional cost. <br /> Roll was called with all council members voting yes, except Council <br /> Members Moore and Gipson who were excused. <br /> Motion carried. <br /> AGREEMENT — PRE-DESIGN STUDY OF FINAL EFFLUENT NORTH <br /> PUMP STATION AND CHLORINATION BUILDING <br /> Moved by Council Member Roberts, seconded by Council Member <br /> Murphy, to authorize the Mayor to sign the Professional Services <br /> Agreement with HDR Engineering, Inc. for the pre-design study of <br /> the Final Effluent North Pump Station and Chlorination Building in <br /> the amount of$356,061. <br /> Roll was called with all council members voting yes, except Council <br /> Members Moore and Gipson who were excused. <br /> Motion carried. <br /> AGREEMENT AMENDED — GEOTECHNICAL ENGINEERING <br /> SERVICES <br /> Moved by Council Member Roberts, seconded by Council Member <br /> Stonecipher, to authorize the Mayor to sign Amendment No. 1 to the <br /> Professional Services Agreement with GeoEngineers, Inc. for an <br /> additional amount not to exceed $110,000. <br /> 432 <br />