Laserfiche WebLink
(10) construction of trickling filters, a solids <br /> contact basin, secondary clarifiers and <br /> associated aeration and pumping equipment; <br /> (11) construction of dissolved air flotation <br /> thickeners and other associated solids <br /> handling facilities and equipment including <br /> sludge utilization/disposal site land and <br /> facilities; and <br /> (12) construction of site piping, utilities, <br /> landscaping and other associated improvements <br /> needed for a complete operating facility. <br /> The City shall provide all equipment, connections and <br /> appurtenances together with all work as may be <br /> incidental and necessary to complete the Project, which <br /> is further described in the "Engineering Report on <br /> Wastewater Treatment Plant Expansion" by Brown and <br /> Caldwell, Consulting Engineers, dated April 1987 . Said <br /> report is on file in the offices of the City. The <br /> Project facilities shall be integrated into the System <br /> as required to provide a fully operational facility. <br /> Other City sewer system improvements which may be <br /> funded in whole or in part from the proceeds of the <br /> sale of the Project Bonds include but are not limited <br /> to: <br /> (1) Upgrades of existing sewer lift stations; <br /> (2) Construction of the South End Sewer Interceptor <br /> from 36th Street South to the Silver Lake area; <br /> (3) Construction of pump stations, force mains, and <br /> gravity sewers for the abatement of combined sewer <br /> overflows; and <br /> (4) Sewer collection main replacements. <br /> The City may make such changes in or additions to the <br /> Project or in the construction or design of other <br /> facilities of the System as may be found necessary or <br /> desirable. Implementation or completion of any <br /> specified improvement shall not be required if the <br /> Council determines that, due to substantially changed <br /> circumstances, it has become inadvisable or <br /> impractical. If the Project has either been completed, <br /> or its completion duly provided for, or its completion <br /> found to be impractical, the City may apply the Project <br /> Bond proceeds or any portion thereof to other <br /> improvements to the System, as the Council in its <br /> discretion shall determine. In the event that the <br /> proceeds of sale of the Project Bonds, plus any other <br /> moneys of the City legally available, are insufficient <br /> to accomplish all of the Project provided by this <br /> section, the City shall use the available funds for <br /> paying the cost of those improvements for which the <br /> Bonds were approved deemed by the Council most <br /> necessary and to the best interest of the City. <br /> The City shall acquire by purchase, lease or <br /> condemnation, all property, both real and personal, or <br /> any interest therein, or rights-of-way and easements <br /> which may be found necessary to acquire, construct and <br /> install the Project. <br /> The estimated cost of this plan of additions and <br /> betterments and all costs incidental thereto, is hereby <br /> declared to be as nearly as practicable the sum of <br /> $46, 500, 000, of which an amount not to exceed <br /> $30, 000, 000 is to be provided out of the proceeds of <br /> the sale of the Project Bonds, and the remainder is to <br /> be provided from expected grants, from payments to be <br /> received from the Mukilteo, Silver Lake, and Alderwood <br /> Water Districts and from other cash now or hereafter on <br /> hand and available therefor. <br />